Laserfiche WebLink
ZEPHYRHILLS FIRE DEPARTMENT <br /> 38410 6th Ave Zephyrhilis, FL 33542 <br /> FIRE SERVICE USER FEES increase 1/1/2018 <br /> Occupancy No.: <br /> Plan Na.; Contractor: 'lam`► C��r^'��r` -�+ <br /> Business Name:- 1�5 t A rA ''7(• Billing Address: <br /> Business Address: s9J9- <br /> 13'.0siness Phone No.: Billing Phone No.: <br /> Business Fax No.: Billing Fax No.: <br /> Contact: Contact: <br /> PLAN REVIEW FEES INSPECTION FEES PERMIT FEE <br /> Annual- <br /> Education,healthcare,De <br /> tention&Correctional Public <br /> Assembly,Business, schools, <br /> Storage,Mercantile and Churches <br /> ;Site Plan N/C Industrial. no charge Sprinkler $50 <br /> 'Multi-Family/Commercial .03 sf up to 800 sq ft $ 24.00 Standpipes $50 <br /> (Minimum Charge$24.00 801-1,500 sq ft $ 34.52 Fire Pump $50 <br /> �i Plan Revisions DBL 1,501-2,500 sq ft $ 60.02 Hoods .$50 <br /> 2,501-3,500 sq ft $ 90.02 Fire Alarm $50 <br /> r SPRINKLER SYSTEMS 3,501-5,000 sq ft $ 127.52 LP Gas $50 <br /> �10-25 Heads $50 5,501-7,500 sq ff' $ 187.52 Natural Gas $50 <br /> i26 plus Heads- $100 7,501-10,000 sq ft $ 262.52 Fuel Tanks- pertank $50 <br /> STANDPIPE SYSTEM 10,001-15,000 sq ft '$ 375.02 Sparklers $100 <br /> �?Per Riser $50 15,001-20,000 sq ft $ 525.02 Fire Works $500 <br /> FIRE PUMP 20,001-30,000 sq ft $ 750.02 Camp Fire(recreation: $25 <br /> Per Pump $100 30,00140,000 sq ft $ 1,050.02 Controlled Burri(15da: $100 <br /> FIRE ALARM SYSTEM 40,001-60,000 sq ft $ 1,500.02 7Q Hood/Duct 50 <br /> l 0-25 Devices $5 60,001-80,000 sq ft $ 2,100.02 Place of Assembly $50 Annual <br /> 80,001-($2,100.02)per <br /> !;26 plus Devices $100 ea add 1,000sq ft $ 0.06 Fire Protection $25 <br /> SUPPRESSION_ SYSTEMS (Business closed until Flammable Application $50 Annual <br /> Wet $50 violations corrected) Waste Tire Storage $50 Annual <br /> (Dry $50 SPRINKLER SYSTEMS Generator<KW $100 <br /> CO2 $50 Hydro Undergrounds $45 Generator>30 KW $100 <br /> r Other $50 Hydrostatic Test $65 per system Bio-Hazard Waste $100 Annual <br /> KITCHEN EXHAUST Acceptance Test $45 per system Fumigation Tenting $50 <br /> Hood/Ducts $5 Hydrant Flow $75 Torch Pot/Applied $50 <br /> y P, <br /> OTHER Haz.Materials $50 •Annual <br /> LP Installation per tank $50 FIRE ALARM SYSTEM <br /> Fuel Tank Installation $50 System Acceptance $50 <br /> (Per Tank) $50 Recall Acceptance $50 <br /> El Natural Gas Installation $50 OTHER <br /> (Per System) Fire Wall/Smoke Wall $15 per wall <br /> Spray Booth $50 LP Gas $25 pertank <br /> Natural Gas $25 per system <br /> Tent 10'x10'or greater $15 per tent <br /> Fire Pump $45 <br /> Fire Suppression $30 <br /> System Acceptance <br /> Exhaust Hood/Duct $30 <br /> Re-inspection DBL <br /> (other than annual) <br /> Inspection scheduled DBL <br /> and cancelled less than <br /> 24 hours <br /> aConstruction Insp. N/C <br /> Emergency Vehicle Acce $50 <br /> PLANS TOTAL 6`� INSPECTION TOT4� PERMIT TOTAL c" <br /> GRAND TOTAL �7��`�� <br /> Comments: <br /> Date: `1 I fff Inspector: <br /> nm <br />