Laserfiche WebLink
'THermaL EXPansion and BonDinG <br /> A thermal expansion gap is required per <br /> each continuous 44'length of modules. ® Bond Path <br /> Grounding Wg <br /> Omit a coupling and leave a 2"gap in <br /> EqulPnunt Grounding <br /> the Rock-It Array Skirt and also between /"--con�aer(EG[} <br /> Ma,rally co eh <br /> the modules at that point. around <br /> . Rock-tt coupling <br /> ■ Rock-It Mount <br /> —Rock-It Array Skirt <br /> BracKeT sPacinG <br /> Portrait Orientation Landscape Orientation <br /> I <br /> l <br /> i <br /> l <br /> 1 <br /> � I <br /> Maximum east/west bracket spacing Is 48"OC. Max east/west bracket spacing is 72"OC. <br /> 32mm modules:Max east/west bracket spacing is 48"OC. <br /> Spacing may vary depending upon project specific structural requirements;i.e.high snow and wind load <br /> areas may require lesserspacing E-W than the ma)amum. <br /> STaGGereD LaYOUT canTILever anD oFFSeT <br /> Staggered Mounting Points �rtantiieve� <br /> Offset — <br /> ®Rock It Mount Rock It Coupling Cantilever. Maximum cantilever Is 1/3 bracket spacing. For portrait <br /> orientation installations,check layout prior to installing. <br /> The array layout instructions in this installation manual offer a <br /> general overview of layout. Periodically,due to a variety of Offset: Offset from all roof edges depends on wind speed,snow <br /> factors(roof obstacles,shading,etc)other layouts are required, loads,local fire and building codes per location it <br /> www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 14 <br />