SMA S136.0-US Inverter with Hyundai HIS-S290RG Modules <br /> 6.96 kW DC Photovoltaic System Electrical Diagram with (2) Series Strings of 12 Modules <br /> OO 7 8 O <br /> Optional Supply Side Connection <br /> To inverter NEC705.12A 5290 (12)Hyundai HiS-S290RG <br /> RG — #12 290 Watt Modules in series <br /> L1 <br /> N M•e <br /> #6 bare copper <br /> GEC 3)#6 11hTdy rector <br /> �HHN/THWN-2 xoep ' <br /> 3fa^Pvc conauR T <br /> #12 <br /> 6o A fused <br /> disconnect with = <br /> 35A fuses existing Man Distribution Hyundai HiS-S290RG <br /> groundig Panel SMA SB 6.0-US Inverter <br /> ele�eL92-9 Module Specifications <br /> 4)#10 AWG PV Wire 3-R,3-13 (1)#6 AWG Bare Copper Pmax:290 Wp Max.Input DC Voltage:600 VDC <br /> Voc: 38.8 V Max ISC per string: 18 A <br /> 200A Panelboard with MPPT Range: 100-550 VDC <br /> (4)#10 AWG THHNITHWN-2 ISC: 9.7 A <br /> 200A Main breaker Vmpp A V Max Output Voltage:240 VAC <br /> O 2-13,2-11 Impp: 9.1 A Max Output current:25 A(AC) <br /> 20OA-2 (1)#8 AWG THHN/THWN-2 .C.Voltage:-0.30 WC AC Nominal Power:6000 Watts <br /> qO 1-G <br /> O 3/4"EMT,FMC(inside structure) Notes: All work to meet or exceed NEC 2011 <br /> 10 OO LFNC,PVC(outside structure) <br /> 690.31E 7 Junction box to be located within the array boundary. Junction box must be minimum Nema 3R UL listed <br /> 11 Nema 3R enclosure.Free air conductors must be installed in raceway if readily accessible as per 690.31(A). <br /> 35A/2 Junction 2 The minimum volume of the Nema 3R enclosure for the transition of PV wire to THWN-2 wire shall be <br /> Box 42 cubic inches. Heyco 5 wire Masthead gland seals or similar connector are required as strain relief <br /> i for PV wire into Nema 311 junction box at array. <br /> 1 i SMA Sunny Boy 6.0-US 3 Interconnection with 35 Amp 2 pole OCPD via 2011 NEC 705.12(D)(2)Load Side Connection. The 35 A <br /> Transformerless Invertei backfed breaker must be located at the opposite end of the bus from the 200 A main supply breaker <br /> ! DC with integrated DC 4 The required PV Backfed breaker plus the main breaker ratio must be less than or equal to 120%of <br /> existing n q p g <br /> grounding I ' ' Ac disconnect the Main service bus rating. 705.12(D)(2) <br /> electrode (4)#8 AWG THHN/THWN- <br /> L� 5 Optional Supply Side connection via 705.12A using parallel line taps in a NEMA 311 box(as required) <br /> • <br /> i 1-B,1-R,1-W,1-G 3/4"EMT,FMC,LFNC, using NSI IPCS4002, Ilsco IPC-KUP-L or NSI Tork IPLD 3/0-3 Multi-Tap Connector or equivalent. <br /> i 5 PV service disconnecting means for"optional"supply side connection must have neutral/EGC bond <br /> i i <br /> � or PVC within and must be listed as"suitable for use as service equipment." 230.66 <br /> 7 The fuses in the disconnect for the"supply side"option must be rated to handle the maximum short- <br /> -- -•---• - <br /> circuit current available at the supply terminals.110.9,110.10 Over-current protection for the supply side <br /> connected conductors shall be located within 10 feet of the connection to the service. 705.31 <br /> F (4)#8 AWG THHN/THWN-2 g Grounded conductor shall be routed with ungrounded conductors to PV Service disconnecting means as <br /> 1-B,1-R,1-W,1-G per 250.24(C)if"Supply Side"option is used. <br /> 3/4"EMT,FMC,LFNC,or PV 9 For"Supply Side option" Continuous or irreversibly spliced Grounding Electrode Conductor installed <br /> Dper 250.24(D). Grounding Electrode Conductor shall be specified as per 250.64 and,sized per 250.66 <br /> 10 The following label is required on meter can and main panelboard"Services fed from dual power sources <br /> 60A 240V AC Disconnect with label: 13 Utility and Photovoltaic system" <br /> 11 •'PV input Do not relocate this OCPD"label required adjacent to backfed breaker. 705.12(d)(7) <br /> On-site Utility Generation DC Disconnect Label Requirements 92 Bonding of module to rail and module to module accomplished through WEEB washers or self grounding <br /> Disconnect Switch(IF REQUIRED BY UTILITY) VmPP 384 VDC mid-clamps. <br /> PV AC Disconnect Label Requirements Vmax 500.5 VDC 13 "Warning:DC conductors of this system are ungrounded and may be energized"required on the <br /> Operating Current:25 A Impp 18.2 A DC Disconnect 690.35F <br /> Operating Voltage:240 VAC Imax 24.25 A 14."Warning:Photovoltaic Power Source"label required on conduit per 690.31(E)(3)(4) <br /> 15. Total voltage drop%for all circuits based on listed conductors is 1.46% <br />