Laserfiche WebLink
L-Mount Installation Instructions <br /> L-Mount I QMLM / QMLM2 <br /> Installation Tools Required:tape measure,roofing bar,chalk line,stud finder,caulking gun,Sealant compatible with roofing <br /> materials,drill with 7/32"bit,drill or impact gun with 1/2"socket. <br /> Elevated Water Seal Technology© <br /> _....................... .......... . ................._..._ Ire.........._.....-.........._.._..._._.. .............._._._.......................... .. ... .......... <br /> THIS EDGE TOWARDS ROOF RIDGE DESCRIPTION CITY. ' <br /> NO. <br /> 1 FLASHING,ROUNDED CORNERS,9"%12"X.04D,5052,MILL 1 t.-a P+"'�• ' t <br /> 1 2 L-FOOL 2'X 3.30"FOR.438"O.D.FASTENER.6061-T6/6005A-T61,MILL 1 <br /> 3 WASHER,SEALING,5/16"ID X 3/4"OD,EPDM BONDED SS I <br /> i 4 LAG SCREW,HEX HEAD,5116'x4",I8-85S 1 '` ��;z• <br /> L-FOOT TX 3.30'.2 X.75"SLOT FOR.438"O.D.FASTENER.6061- I _$ �, <br /> 76 6005A-T61.MILL t d <br /> 7 <br /> 4 2 VERSION <br /> SLOT <br /> SION T 111AI-5 <br /> Locate,choose,and mark centers of rafters to be Careful) liftcom osition roof shin lewith roofing Insert flashing between 1st and 2nd course.Slide <br /> .l OPTIONAL Y P g g g <br /> mounted.Select the courses of shingles where bar,just above placement of mount. Remove up so top edge of flashing Is at least 3/4"higher <br /> J Z :n• 0 mounts will be placed. nails as required and backfill holes with aproved than the butt-edge of the 3rd course and lower <br /> i <br /> iU i lj sealant.See"Proper Flashing Placement"on next Flashing edge is above the butt-edge of 1st course. <br /> page. Mark center for drilling. <br /> J L L i _ 2 j �t <br /> ^ y <br /> ! - 2.0 �--- ., <br /> 0 I Chi <br /> .� <br /> ev 4'.3Y%'fYP <br /> i <br /> 3.30 <br /> ._-1_.. AVAILABLE IN MILL,AND BLACK FINISHES <br /> 1.14 <br /> - f —r-— Quick Mount PY j <br /> ............................................................__._................._I....................._....._.. <br /> ...U.:Q .T 1 :TITLE: 1 - <br /> 3�4 i Using drill with 7 32"bit,drill dot hole into roof Clean off an sawdust,and fill holewith sealant Place L-foot onto elevated flute and rotate L-foot to <br /> gp; QM AA2 QMLM:L-MOUNT,5/16"LAG,9" g / P' y <br /> ! ' } X 12"FLASHING ! and raker,taking care to drill square to the roof. compatible with roofing materials. desired orientation. <br /> ! -J----- ------ Do not use mount as a drill guide.Drill a 2"deep <br /> QMLM UNLESS OIYFAWRE SPECWFD: :SIZE DRAWN BY: RAD 'REV hole Into rafter. <br /> lwI2NPOMMTw MCN[f _ <br /> .... IfGC�110NA1, <br /> ......._.................. ....-.......... ........... ....... ....... ........... ... ..............- .. i A DATE: 6/Y2/201Y <br /> m'o PuceoEn t <br /> oonol xcuE oxnxwc :i> ._..._.. <br /> E ........_.... <br /> ..., <br /> COrYMGXI05111 ONCR MOUM PV �nmrE PIACE DECIM.LL eW¢ !SCNE 1:¢ WGGM:IAA1 SHEnI Of j <br /> rwv:vtrv¢wa"urtn , <br /> 5 4 3 2 <br /> L................._.......................................................-..............................................................._...__.._.................................................................................... <br /> 3 <br /> Quick Mount <br /> �q°" Prepare lag bolt with sealing washer. Using a 1/2 You are now ready for the rack of your choice. <br /> V c k f�\ V n®i 'V inch socket on an impact gun,drive prepared lag Follow all the directions of the rack manufacturer <br /> RESPECT THE ROOF bolt through L-foot until L-foot can no longer easily as well as the module manufactures NOTE:Make <br /> rotate.DO NOT over-torque. sure top of L-Foot makes solid contact with racking. <br /> BI 7.2.3-44 Jun-2017 Rev BI 7.2.3-44 Jun-2017 Rev <br />