Laserfiche WebLink
Florida Set-Up Instructions for the <br /> Vector Dynamics Foundation System <br /> 1.SETVECTOR FOUNDATION PADS <br /> Clear all loose vegetation from the immediate area where the Vector foundation pads will rest. Place a long U-bolt on the <br /> Vector pads as shown.Press or hammer pads into the ground. Vector pads are placed parallel and centered under 1-beam. <br /> Tip: <br /> Place a 318" nut on LSD/Vector <br /> each U-bolt to keep it Combination <br /> in place while you <br /> position the Vector Shown <br /> pads. <br /> '% <br /> TIP. <br /> After centering 1st <br /> block(s)over Vector pads, I` / <br /> place wood cap on top of <br /> first block and use <br /> hydraulic jack between J <br /> pad and I-beam to force <br /> pads into the ground. . <br /> Higher pier sets may <br /> require extra block prior a . <br /> to using hydraulic jack. <br /> qq <br /> ._ .. ,. Lung <br /> U-bolt <br /> 4.TIGHTEN INSIDE HARDWARE <br /> Position 1st block(s) Tighten all previously finger <br /> on pad as shown. tightened hex nuts (1/2" carriage <br /> 2.SET BLOCKS(OR PIERS)ON bolts&3/8"inside U-bolts). J/ � <br /> VECTOR FOUNDATION PADS <br /> Center the foundation blocks over the Vector 5.OUTSIDE TENSION BRACKETS 3 <br /> pads. Attach an outside tension bracket <br /> on the outside of the foundation <br /> blocks and Vector pads. As shown <br /> 3.INSIDE CONNECTIONS right. if - <br /> Insert 1/2"carriage bolt into square hole on 6.TENSIONING-VECTOR STRAPS <br /> top flange of the PVC adaptor. Place the Pull strap past slotted bolt. Cut strap <br /> swivel connector bracket that is attached to 10 - 12 inches past bolt, insert the <br /> one end of the 1-1/4" galvanized strap and strap into the slotted bolt until flush 4 <br /> thread 1/2"hex nut onto carriage bolt(finger with opposite side of bolt. Wind strap <br /> tight). Insert 4" PVC schedule 40 pipe into a minimum of five (5) complete <br /> PVC pipe adaptor and insert over inside revolutions around the bolt. <br /> long U-bolt (through slotted holes). Attach Continue tightening the slotted ^, <br /> 3/8" hex nuts to u-bolt and finger tighten. tension bolt until all slack has been f <br /> Repeat the procedure to opposite side of removed and the galvanized strap is if <br /> PVC pipe. tight. <br /> C; <br /> Cr <br /> TIE DOWN ENGINEERING - 5901 Wheaton Drive Atlanta C <br /> www.tien <br /> • • • • / 1 <br />