My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20279
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:24:40 AM
Creation date
3/4/2019 11:24:37 AM
Metadata
Fields
Template:
Building Department
Company Name
MAJESTIC OAKS
Building Department - Doc Type
Permit
Permit #
18-20279
Building Department - Name
NHC-FL 155 LLC (39536 AUGUSTA)
Address
39536 AUGUSTA NATIONAL DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NUMBER OF LOCK DOWN ANCHOR ASSEMBLIES NEEDED: <br /> Wind Zones 2&3 with roof pitch 6/12 or less. <br /> • Single or Double section homes 30'to 52 in length(excluding hitch) 4 <br /> • Single or Double section homes greater than 52'to 76'in length(excluding hitch) 6 <br /> NOTE: Roof pitches greater than 6/12 will require additional systems,contact Home Pride,Inc.for assistance. <br /> NOTE: Homes less than 30'-Lock Down System should not be used. <br /> NOTE: Home manufacturers may provide a placement chart for specific models in their installation manual. The manufacturer's placement chart supersedes the <br /> chart below. <br /> ANCHOR ASSEMBLY PLACEMENT <br /> Using 4 Anchor Assemblies Using 6 Anchor Assemblies <br /> L' <br /> L-j <br /> L' <br /> i — — —. — — — — — — — <br /> Lock Down Anchor Assembly Components List �s <br /> 1. Ground Anchor with Strut Attachment Cap C <br /> 2. Stabilizer j <br /> 3. Lateral Strut y <br /> 4. Longitudinal Strut <br /> S. Beam Clamp Assembly <br /> as <br /> es <br /> 83 <br /> N4 <br /> 42 <br /> Lock Down Anchor Assembly Installation Instructions <br /> The Ground Anchor with Strut Attachment Cap will take the place of one perimeter anchor <br /> and align with a sidewall vertical strap.Install this anchor at a slight angle,not to exceed l <br /> 15 degrees. This assembly includes a stabilizer plate that is installed with the anchor and <br /> attached with a U-bolt and two nuts.The stabilizer plate should be driven into the ground �—s+dewan sbcv <br /> when the anchor is about 2/3 installed.Attach the stabilizer to the anchor shaft using the <br /> U-bolt and nuts then complete the install of the anchor until the strut attachment cap is <br /> flush to the round or slights recessed into the round,no more than Y.". The Strut <br /> g Y g <br /> t <br /> Attachment Cap should be installed within'r4"or flush to the top of the stabilizer plate. <br /> (See illustration to the right.) t - *�<NOTE:State of Florida allows a 2'pilot holes to be drilled to assist anchor Installation in extremely hard soil conditions. if this process is used during installation <br /> of the Ground Anchor with Strut Attachment Cap the soil must be placed back In the pilot hole and compacted at 6"intervals. This process should take place <br /> when the anchor is 8"-10"from fully installed-allowing room for the soil to be placed back in the pilot hole and properly packed. <br /> HOME4>-PR-IDE 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.