Laserfiche WebLink
Single Family Dwelling. <br /> Pl <br /> anRe-dew omments <br /> 1: F.F.E. shall be a minimum of.8" above.the road.elevation and an engineered site plan. <br /> 2..- Lots shall be graded.to comply with R401.3 of the F.B:.C: . <br /> 3. :Compaction test required if 24" or nrore:offrll dirt is.brought in:at anyone place. <br /> 4.. :Tie in survey required before pouring concrete. <br /> 5. Driveways:require a R.O:W. use permit. A11.4 sides of driveway thru the sidewalk shall have <br /> expansion material:. <br /> 6.. All setbacks.shall be met.. . <br /> 7. All-pro perty.markers shall be uricovered'and marked.at time of first inspection: <br /> 8:. All A.D.A.-requirements,shall be met.:'. <br /> 9. No electric, plumbing, mechanical, or framing shall be covered without an.inspection and <br /> approval first. <br /> 10. All Garages shall.comply with:section R302:6,of the F.B.C.(Fire Separation).. <br /> 11:Appliances shall'not be installed in a location where subject to rriechanical damage:unless <br /> protected'byapproved barriers. M303A of the F.B.0 <br /> 12. Water heaters shall comply with section:.P607.3 rof the F.B.C. <br /> 13. Foundation supports for A/C units shall be raised at least 3" above finished grade. M1308.1. <br /> . <br /> 14. Return air in all.bedrooms. F.B.C. M1620.4.. <br /> 15. Smoke detectors are.to be installed iri accordance with:R313.1 of the:F.B.C. <br /> 16. All glazing requirements are-to be in accordance with R308.4.of the F.B.C. <br /> 17. All means_of egress are d.be in accordance with R31 l:of the F.B.C. - <br /> 18. "Green gypsum board shall riot be used as.a backer in.showers or tubs. R702.44.2 F.B.C. <br /> 19. Combination-type AFCI breakers are.required;at all.locations requiring an AFCI,type breaker: <br /> 20:;Carbon monoxide alarms will.be required in.new construction that uses fossil-burning heating <br /> :or appliances or'-an attached garage: ;They shall be installed in accordance with,the F.B.C: <br /> 21. All plumbing, mechanical,:and.electrical shall.be separate from unit to:unit-. Thisincludes all <br /> underground plumbing and electric: <br /> '22. All 2016 N.E.C: Codes:will be enforced.. <br /> 23: Tarrrper-Resistant Receptacles iri accordance with 406.11 of the 2016 N.E:C <br /> 24: In accordance.with the Land:Development:Code, lots shall be sodded before final at least 10. . <br /> feet around the structure. :: <br /> 25. Blower door test and blown in irisulatioii card shall be provided before C.O. <br /> 26.A copy of the ener'gy cdclssltall be withpern:it at all times. <br /> 27. Copy of final insulation report shall be provided:with:permit before:fnaL <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t.'Edition <br /> R.O.W.-Right of Way <br /> A.D:A.-Americans with Disabilities Act N.E.C.-National Electric Code(2011) <br />