NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance;with any,,
<br /> applicable:dead-restrictions:. :.
<br /> -UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: if the owner has hired a contractor or
<br /> contractors'to undertake work,they may be requiredfo be licensed in accordance with state and local regulations';If the
<br /> "
<br /> . ...
<br /> contractor is not licensed as required by law, both the owner and'contractor may be citedfor a misdemeanor violation
<br /> under state law_. If the-owner or intended"contractor-are.uncertain as-to what licensing requirements•may.apply'for the'
<br /> intended work,they are advised to contact the Pasco County guiiding inspection Division-Licensing Section at 727-847-
<br /> 8009' Furthermore, if the owner has"hired"a contractor or contractors, he is advised to have the coritractor(s)'sign
<br /> portions of the"contractor Bidck"of this application for-which they will be responsible. If you, as the owner sign as the
<br /> contractor,that may be an indication that he is not properly licensed and is not entitled to permitting•privileges•in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACTIUTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of
<br /> use In existing buildings, or expansion of existing buildings;,as specified in Pasco County Ordinance number 89-07.and.
<br /> 90-07„as amended.. The undersigned.,also-understands,that such 1.fees,as maybe due,Will-be identified at the iim' di of
<br /> permitting. it is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid,prior.to
<br /> receiving a"certificate of occupancy"or final power release: If the project does not involve a certificate of occupancy or
<br /> final power release,the fees-must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer impact_
<br /> fees are due,they must be.paid prior to permit issuance in accordance with applicable Pasco County ordinances:
<br /> CONSTRUCTION LIEN.LAW(Chapter_7.13,Florida Statutes,as°arnended): If valuation of Work'is$2,600:00 or'more,I
<br /> certify that 1, the applicant,-have been provided with a copy of the "Florida Construction Lien Law--Homeowner's
<br /> Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. lf.the applicant Is'someone:
<br /> other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner"prior to commencement.
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT:.,I certify that all 4he information in this application is accurate and that all;work
<br /> will be done in compliance with all applicable.laws regulating construction,zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of.a permit and that all work will.be'r performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development,regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other govemment agencies may apply to.the'intended work,and that it is
<br /> my responsibility to identify what actions 1 must take to be in compliance. Such:agencies include but are not limited to:
<br /> -! Department of Environmental Protection-Cypress Bayheads, Wetland Areas and.Environmentally Senisitive
<br /> Lands,WaterlWastewater Treatment: -
<br /> Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways.
<br /> Department of Health & Rehabilitative Servlc6a/Enviro1nmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks..
<br /> US Environmental Protection:AgeiicyAsbestos abatement.
<br /> Federal Aviation Authorify-Runways.
<br /> I understand that the folloWitig,restrictions,apply.to the use of'f11:
<br /> Use of fill is not.allowed in'Flood Zone'V unless ezpcessly permitted.,
<br /> If the fill material is to=be,.used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating.volurne"will.be.;submitted.at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> If the fill material:is-to-be used*im,Flood Zone,"A",in connection with a permitted building using stem wall
<br /> construction'l certify that fill wilfbe used only to fill the'area within the-stem wall
<br /> If fill material.is to be used In any area, I certify that use.of such fill will not adversely affect adjacent
<br /> properties. If use of fill-is found:#o-adversely affectadjacerit properties,the owner may be cited for violating
<br /> the,conditions,of.the building permit issued under„the.attached permit application,for lots less than one(1)
<br /> acre which.are elevated'by fill,',an'engirteered drainage;plamis required. }
<br /> If I ain the AGENTFOR THE OWNER,i promise In good faith to inform-the owner of the permitting conditions set forth in
<br /> this affidavit.prior to commencing construction. I understand that a separate,permit may be required for electrical work,
<br /> plumbing,signs, wells; pools, air conditioning, gas, or other installations not specifically Included in the application. A
<br /> permit issued shall.be construed to.be a license to proceed with the work and not as authority to violate,cancel,alter,-or
<br /> set as any provisions of the technical codes,nor-shall issuandb'of a permit prevent the Building,Official from thereafter
<br /> requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the.work authorized by_such permit is commenced within six months,of permit Issuance,or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6)months after'the time the work is,commenced, An extension
<br /> may be requested, in writing,from the Building Official for a'period'not:to exceed ninety(90)days and will demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned3
<br /> WARNING'TO OWNER:,.YOUR FAILURE TO RECORD.A.NOTICE OF COMMENCEMENT MAY_RESULT,IN,YOUR
<br /> PAYING TWICE FOR-IMPROV.EMENTS,To YOURPROPERTY:".iF Y60 INTEND'Tt70BT,,AlN'F1N 4NCINd CONtULT
<br /> WITH YOUR LENDER OR AN ATTORNEY.BEFORE RECORDING'YOUR NOTICE OF COMMENCEMENT.
<br /> FLORIDA JURAT(F.S.117.03)
<br /> OWNER OR AGENT. CONTRACTOR i
<br /> Subscribed and sworn to,(or affirmed)before me this Subscribed a d swom'Mao ad}�efor me is'
<br /> by �by �e-
<br /> Who is/are personally known to me or hasthave produced Who i re r sonally known to' a or has/have produced
<br /> l�as identification. f✓ 1 IS 14t ce,",%A— as Identification.
<br /> Notary Public ' 9 Notary Public
<br /> Commission No. Commi ' n No.
<br /> Name of Notary typed,printed or stamped Name of Notary edr,(1d� ors ELINE B06ES
<br /> :Ot�iS Pib�yi
<br /> *' := Commission#FF 150422
<br /> Expires December 12,2018
<br /> 00nd0d Thru Troy Fain lnsurancaam385.7018
<br />
|