My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20533
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 8:19:30 AM
Creation date
3/18/2019 8:19:29 AM
Metadata
Fields
Template:
Building Department
Company Name
MOORES FIRST ADDITION
Building Department - Doc Type
Permit
Permit #
18-20533
Building Department - Name
WEBSTER,JEFFREY B & JANA
Address
4748 9TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lerna's Heating,Cooling&Plumbing,Inc. Estimate 45328747 <br /> 18843 US Hwy 41 N Job 45321339 <br /> Lutz,FL 33549 Estimate Date 11/28/2018 <br /> 813-948-6355 <br /> #CAC1813676/#CFC1429475 Completed Date <br /> A " d Customer PO <br /> Billing Address Job Address <br /> Jana Webster Jana Webster <br /> 4748 9th Street 4748 9th Street <br /> Zephyrhills,FL 33542 USA Zephyrhills,FL 33542 USA <br /> Estimate Details <br /> Base: 14 seer 2 ton air conditioner with 5kw electric heat horizontal in attic. New lenums. Seal minor duct leaks. Light kit <br /> and plywood at scuttle hole. Install Saturday morning Wells Fargo financed#5774 4223 4140 3326. <br /> Task# Description Quantity Your Price Your Total <br /> 1605 2 TON S/C(LEGACY) 1.00 $5,143.00 $5,143.00 <br /> 114CNA024000 <br /> FB4CNF030L00 <br /> AUXILIARY HEATER <br /> COR7 WIFI THERMOSTAT <br /> 10 YEAR PART 1 YEAR LABOR <br /> SEER:14 <br /> EER:11.5 <br /> AHRI#10059852 <br /> SINGLE STAGE COMPRESSOR <br /> HORIZONTAL 1.00 $150.00 $150.00 <br /> • Hanging kit <br /> • Flush refrigerate line set with RX11 flush <br /> • Reconnect to existing line set,Cover with UV protected arma-flex <br /> • Reconnect to existing electrical <br /> • Reconnect to existing ductwork <br /> • Reconnect to existing drain line(30 day warranty) <br /> • New filter drier <br /> • Hurricane slab(as needed) <br /> • Hurricane clips <br /> • Charge unit per manufacture specifications <br /> • Remove and haul away of old equipment <br /> • Clean up all work areas to customer satisfaction <br /> • Permit included <br /> Sub-Total $5,293.00 <br /> Tax $0.00 <br /> Total $5,293.00 <br /> IERNA Your Trust-IERNA Your Business! <br /> By signing this document you confirm that you have a full understanding of the information being presented to you with no warranties <br /> or guarantees of conditions that are not seen,nor identified.Any concerns of the home's or business's existing duct system have been <br /> discussed with you and if the homeowner/business owner opt not to replace the existing duct system,iERNA's nor it's representatives <br /> shall be held liable in any way for any performance issues and/or premature breakdown of new equipment that may arise from the <br /> home or business's existing duct system.Customer's signature on this form signifies that you have read and understand the <br />
The URL can be used to link to this page
Your browser does not support the video tag.