Laserfiche WebLink
C3MGrooved Mechanical Branch Tee AWIL <br /> Mechanical branch connections for reducing branch outlets <br /> without welding. The MT-2 is a bolted saddle type fitting <br /> with grooved outlets. Design assures superior sealing, full <br /> pipe support, excellent stability and easy installation. <br /> For the latest UL/ULC listed, LPCB, VdS and FM Approved <br /> pressure ratings versus pipe schedule, see www.anvilintl.com <br /> or contact your local Anvil Representative. <br /> C&S <a> � t <br /> USFED APPROVED M R�Ylil r 'o <br /> For listings/Approval Details and Limitations,visit our wobsito at <br /> wvnv.anvilin!1.corn or contact an Anvil-Sales Representative. <br /> —MATERIAL SPECIFICATIONS <br /> HOUSING: GASKETS: Materials <br /> Ductile Iron conforming to ASTM A-536,Grade 65-45-12 Properties as designated in accordance with ASTM D-2000. <br /> ANSI BOLTS & HEAVY HEX NUTS: 0 Grade"E"EPDM(Green color code) <br /> Heat treated,oval-neck track head bolts conforming to ASTM A-1 83 -40°F to 230°F(Service Temperature Range)(-40°C to I I 0`Q <br /> Grade 2 with a minimum tensile strength of 110,000 psi and heavy hex nuts Recommended for water service,diluted acids,alkalies solutions, <br /> of carbon steel conforming to ASTM A-563 Grade A or Grade B,or SAE oil-free air and many chemical services. <br /> J995 Grade 2.Bolts and nuts are provided zinc electroplated as standard. NOT FOR USE IN PETROLEUM APPLICATIONS. <br /> METRIC BOLTS &HEAVY HEX NUTS: <br /> Heat treated,zinc electroplated oval-neck track head bolts made of carbon <br /> steel with mechanical properties per ISO 898.1 Class 8.8.Hex nuts and <br /> bolts are zinc electroplated followed by a yellow chromate dip. <br /> COATINGS: <br /> El Rust inhibiting point Color:ORANGE(standard) <br /> D Hot Dipped Zinc Galvanized(optional) <br /> 171 Other available options:Example:RAL3000 or RAL9000 Series <br /> For other coating requirements contact an Anvil Representative. <br /> LUBRICATION: <br /> OStandard Gruvlok <br /> 0 Gruvlok XtremeTm required for dry pipe systems and freezer applications. <br /> PROJECT INFORMATION APPROVAL STAMP <br /> Project: []Approved <br /> Address: ElApproved as noted <br /> Contractor: Not approved <br /> Engineer: Remarks: <br /> Submittal Date: <br /> Notes 1: <br /> Notes 2: <br /> FP-4.12 <br />