Laserfiche WebLink
SYMBOLS GENERAL NOTES <br /> ® Work Area 1.Route pedestrian traffic around work areas when construction 7. Provide a 5'wide temporary walkway,except where space restrictions warrant <br /> activities encroach on the sidewalk for more than 60 minutes a minimum width of 4'.Provide a 5'x 5'passing space for temporary walkways <br /> ■ Channelizing Device(See Index 600) using the devices and remedies shown on this Index.Use project less than 5'In width at intervals not to exceed 200'. <br /> []� Work Zone Sign specific designs for scenarios not included on this Index. <br /> 8. Provide across-slope with a maximum value o/0.02 for all temporary <br /> Required Locations For Either Temporary 2.For spacing of traffic control devices and general TCZ walkways. <br /> CR Or Permanent Curb Ramps. requirements refer to Index 600. The maximum spacing between <br /> barricades,vertical panels,drums or tubular markers is 25'. 9.Temporary walkway surfaces and ramps must be stable,firm,slip resistant,and <br /> Lane Identification+Direction of Traffic kept free of any obstructions and hazards such as holes,debris,mud, <br /> Pedestrian Longitudinal Channelizing Device(LCD)with 3.Use delineators on longitudinal channelizing devices separating construction equipment and stored materials. <br /> the work area from vehicular traffic. <br /> Mounted Work Zone Sign or separate Work Zone Sign <br /> 10.Remove temporary walkways immediately after reopening of the sidewalk,unless <br /> H Pedestrian Longitudinal Channelizing Device(LCD) 4.Cover or deactivate pedestrian traffic signal otherwise noted in the plans. <br /> display(s)controlling closed crosswalks. <br /> 11.Meet the requirements of Index 304 for temporary curb ramps. <br /> 5.Post mounted signs located near or adjacent to a sidewalk must <br /> have a 7'minimum clearance from the bottom of sign to the 12.Place pedestrian longitudinal channelizing devices)across the full width of the <br /> surface of the sidewalk. closed sidewalk.For temporary walkways,similar to the Sidewalk Diversion, <br /> place LCD's to delineate both sides of the temporary walkway. <br /> 6.When construction activities involve sidewalks on bath sides of <br /> the street,stage the construction so that one sidewalk Is in <br /> service at all times.If this is not feasible and both sidewalks <br /> must be closed,as determined by the Engineer,provide a detour <br /> to guide pedestrians around the construction zone. <br /> a _ CR <br /> � ,r1 n n <br /> y! <br /> 3H3H SSOHO <br /> DETOUR I ~Otl3HV <br /> � 03SOlONNM301S 8 <br /> 7 <br /> ano�a � a <br /> 11 p 03S01.7 uai DETOUR N F e � ry ' CR �NVM�S3�3d <br /> _ is 4 )IlVM301S <br /> m w Y ><� y ROAD 43SO�0 <br /> 3:C/) � )Ilt/M301S <br /> o LU 0 Q <br /> c �U <br /> 3 <br /> dl �] SIDEWALK <br /> a a CLOSED ^ <br /> ` R PEDESTRIAN <br /> b CR N n ■ N ti taJ CR `WALKWAY <br /> ~ DETOUR <br /> 4� V <br /> anOV130 SIDEW,=tAo� anol3a any O to <br /> `YUSE OTHER SIDE Yl CR <br /> EA-4 <br /> I� f� 7r—,-4 <br /> 1 0 j V Il ROAD t3 1� .��1 WORK BOOR-I( AHEAD <br /> AHEAD <br /> CROSSWALK CLOSURE AND SIDEWALK DETOUR SIDEWALK DIVERSION <br /> PESESTRIAN DETOUR <br /> LAST 0 DESCRIPTION: INDEX SHEET <br /> REVISION __[�F O� FY 2017-IS PE][DESTRHAN CONTROL FOR CLOSURE OFSXDEWALKS NO. No. <br /> 11101116 DESIGN STANDARDS <br /> 660 1 of 1 <br />