My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18829
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 9:20:38 AM
Creation date
5/23/2019 9:08:54 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
17-18829
Building Department - Name
CITY OF ZEPHYRHILLS LS #6
Address
5335 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES <br /> SYMBOLS <br /> ® 1.Route pedestrian traffic around work areas when construction 7. Provide a S'wide temporary walkway,except where space restrictions warrant <br /> Work Area activities encroach on the sidewalk for more than 60 minutes a minimum width of 4'.Provide a 5'x 5'passing space for temporary walkways <br /> ■ Channelizing Device(See Index 600) using the devices and remedies shown on this Index.Use project less than 5'in width at Intervals not to exceed 200'. <br /> specific designs for scenarios not included on this Index. <br /> Work Zone Sign 8. Provide across-slope with a maximum value of 0.02 for all temporary <br /> Required Locations For Either Temporary 2.For spacing of traffic control devices and general TCZ walkways. <br /> CR Or Permanent Curb Ramps. requirements refer to Index 600. The maximum spacing between <br /> barricades,vertical panels,drums or tubular markers is 251. 9.Temporary walkway surfaces and ramps must be stable,firm,slip resistant,and <br /> b Lane Identification+Direction of Traffic kept free of any obstructions and hazards such as holes,debris,mud, <br /> Pedestrian Longitudinal Channelizing Device(LCD)with 3.Use delineators on longitudinal channelizing devices separating construction equipment and stored materials. , <br /> a Mounted Work Zone Sign or separate Work Zone Sign the work area from vehicular traffic. <br /> 10.Remove temporary Walkways immediately alter reopening o/the sidewalk,unless <br /> H Pedestrian Longitudinal Channelizing Device(LCD) 4.Cover or deactivate pedestrian traffic signal otherwise noted In the plans. <br /> display(s)controlling closed crosswalks. <br /> 11.Meet the requirements of index 304 for temporary curb ramps. <br /> 5.Post mounted signs located near or adjacent to a sidewalk must <br /> have a 7'minimum clearance from the bottom of sign to the 12.Place pedestrian longitudinal channelizing device(s)across the full width of the <br /> I1 surface of the sidewalk. closed sidewalk.For temporary walkways,somilar to the Sidewalk Diversion, <br /> II 4 place LCD's to delineate both sides of the temporary walkway. <br /> V 6.When construction activities involve sidewalks on both sides of <br /> the street,stage the construction so that one sidewalk is in <br /> service at all times.If this Is not feasible and both sidewalks <br /> must be closed,as determined by the Engineer,provide a detour <br /> to guide pedestrians around the construction zone. <br /> Ca _ CR <br /> b col <br /> 1 CR <br /> 3i13H SSO21D <br /> DOUR ♦py3{{y <br /> � O3SOl0 NNM301S � <br /> I anol3a <br /> QJ Q3S0�0 u�i D OUR ry F ■ ry F CR ` NtlRtLmd <br /> _ is 4 NltlM301S <br /> m w Mo AHEAD i <br /> 10 t(1 SIDEWALK <br /> aJill <br /> CLOSED <br /> R PEDESTRLW <br /> b b CR o n ■ � 'Jai <br /> CR `WALKWAY <br /> ry ti g <br /> DETOUR <br /> _ 4 <br /> to LP C�p <br /> an013a SIDEWALK CLOSED ano.t�o _ <br /> anona l t J <br /> � USE OT~D Y CR <br /> ROAD ROAD <br /> WORK WORK <br /> i (I ROAD OC I n o AHEAD AHEAD <br /> _ � WAHEAD A u <br /> CROSSWALK CLOSURE AND SIDEWALK DETOUR SIDEWALK DIVERSION <br /> R PESESTRIAN DETOUR <br /> LAST DESCRIPTION: FY 2017-18 INDEX SHEET <br /> R6vrsION FDOT FIEIIDIESTRUAN CONTROL FOR CLOSURE OF 8H DEWALKS No. ND. <br /> 17/01/16 DESIGN STANDARDS 660 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.