My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19905
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 9:43:32 AM
Creation date
5/23/2019 9:43:31 AM
Metadata
Fields
Template:
Building Department
Company Name
GRAND HORIZONS
Building Department - Doc Type
Permit
Permit #
18-19905
Building Department - Name
SOUTHERS,THOMAS & CHARLENE
Address
37640 COREY LEWIS AVE LOT 225
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> OLIVERCNOOIES rctision 6?07 <br /> DANS f GOFLORl T4LON tNSTR3COR TFiI<. <br /> MOt3EL iitli"V"SERIES ALL STEEL FQUtjQATIOjj SYSTEM � <br /> ` MODEL#i01"Y"(STEPS.1-i5). :. <br /> LONGITt1DiMAl.ONLY FOLLOW STEEPS.1-9 . <br /> FOR ADb1,YG_LA?ERAL ARM _Fo#o*Steps 10.15 <br /> FOR CONdRC Mi' 'APPIX AT70fl1S:For ow SfEp 16-19 <br /> ENGINEERS SWAP i E'GI!�EERS ST.W f?' <br /> 1. SPECIAL CIRCUIJSTANCES.,if the following conditions Occur=STOPI Contact Oliver Technologies at 1-800-284-7437; <br /> a) Pier height exceeds.48' b) Length of home exceeds 76'c)Roo€•eaves exceed 16"d)Sid <br /> ewall height erceed_96' <br /> e) Location is within 1500 feet of coast <br /> INST LLAIL9H OF GROUND PAf# <br /> 2. Remove weeds and debris in an.approximate two foot square to,expose firm soil for each ground pan (C) . <br /> 3. Place ground pan(C)directly,belovr chassis I-beam:Press or drive pan f reply into_soli until flush with or below soil. <br /> SPECIAL NOTE:The fongi#udinal"V'brace system serves as a pier cinder (tie nor ie and should be loaded as any <br /> other pier. It is recommended that after leveling piers;atiii orie-third iticit(l13')before home is lowered completely on <br /> to piers, complete steps 4 through 9 belo}+r fherl rerrEti e jacks.. <br /> itdSTALt,ATtOhI CF .ONGITIICihtAL"Y"'BRACE SYSTEM <br /> NOTE: WHEN INSTAU.ING THE.I.ONGffVD Mfit_SYSTE&Ijd &`;,;A miNiMUM'OE 2 SYSTEMS PER FLOOR_SECTIOk IS O.EzQ 1ftED,SOIL TEST <br /> PROSE SHOULD?BE USED TO DETERIAINEi CORihCT TYPE,OF ANP"glr_PF_R SOIL CI.Aa�IFICAT)O%IE PROBE i ST RE-ADIII'G$�.RE 6cTVt'EEti <br /> #73_&275 A 5 FOOT P+1dL:;i0I2 r�7UST BE I3SED,iF,PR0i31=TEST READINGS ARE,BET &EN 276&350 A 4 FOOT,ANCHOR t AY 5E USED,i181: <br /> GROU.14D XNdHOR3 Wtl-k DiAGONALTIES AND stKb j Ei2-ELATES EVERY 5'4"--VERTICAL1ptS ARE ALSO 1REQl11REt7 ON HOMES SUPPLIEDlmni VERTICAL TIE CONNECTION POINTS(PER FLORtDA RECt), <br /> 4.Select the correct square tube brace(E)length for set-,up(pier)height at support location:(The 18"tube is alvrays <br /> used eS the bait;im. part of the longstutii^ai a r I).Mots:Either tube can bs used by itself,cut and drilled to length as tong as a <br /> 4{1 to 45 ctearee artyfe Is-niaintainsd: <br /> PIER HEIGHT 1,25"ADJUSTABLE I M"ADJUSTABLE <br /> (t�,Ppr x:'45 degrees t iaX:) Tube Length Tube t.er g#h <br /> - :e=. - Y<'= .zS'= �' - Ili_:` - <br /> _mac„_.._.r..,.�--,. :: _ _ <br /> -z <br /> 24 314E to 32114p <br /> •%i-: 3.is s�v c'F_� _ _ - -_ ti+'>-x=._,.b�' _ "f.`- _ _ <br /> S. install(2)of the 1,50"square tubes(E (i W tubel}into the`UA bracket(J),insert carriage bolt and leave nut loose for final <br /> adjustment. <br /> 6. Place i-bearn connector(P)loosely on the bo toln flange of the Ib.eam. <br /> 7. Slide tire-selec>tc-61.25'tube(E)into a 1.5T tube(E)and 6'Ma h to I-beam aonrieCtors;(F)and fasten loosely with bolt and nut. <br /> 8, Repeat steps 6 through 7 to create the'V pattern•of the square tut.-s looselyi 1 place.The angle is not to exceed 45 <br /> degree and not below 40 degrees. <br /> 9.Aftst all bolts are'aglitened;secure 1.25' and 1.5iY tubes using f6ar(4)114'-14 x 3W self tapping s—,eves h pre-drilled holes. <br /> I <br /> INSTALLA <br /> to F T F_ P T A I <br /> THE MOL'EL 11L# "V"(LOKGSTUDIIsi-L&Lk El v'�L P?R'n_TECTtON)_ ELI.+33?+iATES THE NEED FOR MOST STAEiLtZER PLATES E FRAME TIES. <br /> NOTE:THE USE OF THIS SYSTEM REOULRESYERTICAL TIES SPACED AT 5'4". <br /> FOUR FOOT(4't GROUND A14CHOR M.AY BE USED.EXCEPT M' .MET H HOIAE tM.LhUFACTURER SPECIFIES I31-FEREINT. <br /> 10. install remaining vertical tie.-down Straps and 4'•around anchors per home manufacturer's ihSTjCt-onS.NOTE:Centedine <br /> an om t- ae sized a6cordiflg to soit tof Lie c,6nditlIIn Any manufadirer's speGfi:alionS for sidewall anchor lbass in'excess of <br /> 4,000 lbs.require a 5'anchor per Ron&Code. <br /> 11. NOTE:Each system is required to have a frame fie and stabilizer attached at earn la eral arm stabilizing iocation.This frame tie <br /> stabilizer plate needs to be located within I from of center ground pan. <br /> 12. Select the correct square tube brace(H)length for setup lateral transvverse at support location.The lengths came in either r5jr' <br /> or 72"lengths. (Yith the 1.50"tube as the bottom tube, and the 1.25'tube as the inserted tube.) <br /> 13,Install the 1.50 transverse brace (H)to the ground pan connector(D)with bolt and 6,,ut <br /> 14.Slide 1.25"transverse brace into the 1.50E brace and attach to adjacent I-beam mrinector(I )vrih bolt and plat <br /> 15.Secure 1.50"transverse arm to 1.25" transverse arm using four(4) 114'- 14 x 3!4'self-tappAnq Screws In rare-drilled holes. <br /> OLIVER TECHNOLOGIES, INC. Telepho;e:831-795-4555 <br /> 1-800-284-7437 Fax-931-796-8811 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.