My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19908
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 9:54:52 AM
Creation date
5/23/2019 9:54:51 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYRHILLS MERCHANT SQUARE LLC
Building Department - Doc Type
Permit
Permit #
18-19908
Building Department - Name
ZEPHYRHILLS MERCHANT SQUARE LLC
Address
7403 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMcheck Software Version 4.0.8.1 <br /> Inspection Checklist <br /> Energy Code: 2017 Florida Building Code, Energy Conservation <br /> Requirements: 100.0% were addressed directly in the COMcheck software <br /> Text in the "Comments/Assumptions" column is provided by°the user in the COMcheck Requirements screen. For each <br /> requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception <br /> is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. <br /> Section <br /> # Plan Review - Complies? Comments/Assumptions <br /> &Req.lD <br /> C405.6 Plans,specifications,and/or ;❑Complies Requirement will be met. <br /> [PR17]1 calculations provide all.information ;❑Does Not <br /> with which compliance can be <br /> determined for the electrical systems ❑Not Observable <br /> and equipment and document where UNot Applicable , <br /> exceptions are claimed. Provisions are <br /> made for metering individual tenant <br /> units. Feeder connectors(for feeder <br /> and branch circuits)sized in <br /> accordance with approved plans with <br /> maximum drop of 5%voltage drop <br /> total. <br /> C103.2 Plans,specifications, and/or `❑Complies 'Requirement will be met. <br /> [PR4]1 calculations provide all information T]Does Not <br /> with which compliance can be <br /> determined for the interior lighting ,❑Not Observable <br /> and electrical systems and equipment '❑Not Applicable <br /> and document where exceptions to <br /> .the standard are claimed.Information <br /> provided should include interior <br /> lighting power calculations,wattage of; <br /> bulbs and ballasts,transformers and <br /> control devices. <br /> C406 Plans,specifications,and/or C❑Complies Requirement will be met. <br /> [PR9]1 calculations provide all information ;❑Does Not <br /> with which compliance can be <br /> .determined for the additional energy ❑Not Observable <br /> efficiency package options. ❑Not Applicable <br /> Additional Comments/Assumptions: <br /> 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3. Low Impact(Tier 3) <br /> Project Title: Report date: 04/09/18 <br /> Data filename: \\share.peiatl.com\projects\118\118166 PT Solutions Zephyrhills FL\118166 Com.cck Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.