My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19911
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19911
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 9:58:37 AM
Creation date
5/23/2019 9:58:35 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
18-19911
Building Department - Name
TROYER,DARVIN W REVOC TRUST &
Address
5203 17TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 07/10/18 09:20AM, EDT Kerns Family Construction -> 813780002 <br /> 1 Pg 4/4 <br /> for all work completed and for any loss sustained by him for materials affixed to the <br /> residence,plus rental costs through termination date associated with equipment, tools, or <br /> machinery to the extent of actual loss thereon plus loss of a reasonable profit. If Owner <br /> makes the progress payment during the five days following receipt of written notice, then such <br /> payment is deemed to cure any potential non-payment default. <br /> 9: If Contractor defaults in any provisions herein or fails to carry out the construction in <br /> accordance with the Contract Documents, Owner shall provide Contractor with written <br /> notice of the specific act or acts constituting such default. If Contractor fails to commence <br /> to correct such default within ton 10 days from receipt of such notice, Owner may <br /> terminate this contract before the termination date hcrcof.On such termination Owner may <br /> take possession of the work site and all material thereon and finish the work in whatever <br /> manner he deems expedient. <br /> 10. This agreement is binding on the parties hereto, their respective personal representatives, <br /> heirs,successors and assigns. <br /> 11. The Contractor is not responsible for any delays as a result of any act of God,material or <br /> labor shortages, as a result of transportation difficulties, delay in architectural or interior <br /> design plans, delay in finish selections or permitting pTrocessing. Notwithstanding the <br /> above,the parties agree that time is of the essence in this project. <br /> The parties signcd this agreement,as of the date first set forth. <br /> Date: 07-09-2018 %�trr , 'ia�-ice <br /> t1VL'pJ 1 Lt1tiJ1Y VVlA0LL 4V LLV/.L`.V., ...V. <br /> Tony Kerns,President <br /> Date: 07.09-2018 T a w.;P Ll, <br /> Darvin W. Troyer <br /> Ruth Ann Troyer Or <br />
The URL can be used to link to this page
Your browser does not support the video tag.