Laserfiche WebLink
FLORIDA ENERGY EFFICIENCY-CODE <br /> FOR BUILDING CONSTRUCTION <br /> Envelope Leakage Test Report <br /> Prescriptive and Performance Method <br /> Project Name: Galen 2432 Elev D Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> City,State,Zip: Zephyrhills,FL, Permit Number:. <br /> Design Location: FL,Tampa Jurisdiction: <br /> Cond.Floor Area:: 2432 sq.ft. Cond.Volume: 20139 cu ft. <br /> Envelope Leakage Test Results Leakage Characteristics <br /> Regression Data: <br /> C: n: R: <br /> CFM(50): <br /> Single or Multi Point Test Data <br /> HOUSE PRESSURE FLOW: ELA: <br /> 1 Pa cfm EgLA: <br /> 2 Pa cfm ACH: <br /> 3 Pa cfm ACH(50): <br /> 4 Pa cfm <br /> 5 Pa cfm SLA: <br /> 6 Pa cfm <br /> R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour <br /> in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through S.Testing shall be conducted with a blower door at a pressure of 0.2 <br /> inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an approved third party.A written report of the results of the <br /> test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all <br /> penetrations of the building thermal envelope. <br /> During testing: <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other <br /> infiltration control measures; <br /> 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration <br /> control measures; <br /> 3.Interior doors,if installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open. <br /> I hereby certify that the above envelope leakage Where required by the code official, o&TgE S74�t� <br /> performance results demonstrate compliance testing shall be conducted by anY Z <br /> with Florida Energy Code requirements in approved third party.A written <br /> accordance with Section R402.4.1.2. report of the results of the test shall <br /> be signed by the third party .. .;1;?�.._ _ o <br /> conducting the test and provided to # n <br /> SIGNATURE: the code official. <br /> tr(,Gob W-E <br /> PRINTED NAME: <br /> BUILDING OFFICIAL: <br /> DATE: DATE: <br /> 1 1/9/201 7 1 0:47 AM EnergyGauge@ USA-FlaRes2014 -Section R405.4.1 Compliant Software Page 1 of 1 <br />