Laserfiche WebLink
Plan Review <br /> Modular Horne Set=up s and Alumdnum. .Packa es <br /> 1),All property markers shall'be exposed and,clearly.marked at time of first <br /> inspection; . : <br /> 2).All setbacks shall be.met.:: : . <br /> 3):-All garages:shall comply With section:309:2 (Fire separation ). <br /> 4)Access shall be made available at lime of inspection; <br /> 5)'Manufacture. specification manual, approved plans.11ld:permit;shall be available at <br /> time.of inspection: <br /> No electric lumbin mechanical or framin is to be covered without ins ection:a <br /> 6) p . g, g .- p.. arid- <br /> approval:first. <br /> ..7) R.O.W Use permit required.for.driveways. on public streets: :. <br /> 8):At.least.10' separation between other units-in uriplatted locations.: . <br /> :9)All:work-shall comply:with the:F:B:.C; 6t. edition-and-the.20:14.N.E:C. <br /> 10) Cle0h.outs. shall.be.instal:led..-o -code: <br /> R.O.W : _ Right Of Way <br /> F B:C. -. Florida Building Code <br /> N.E.C. National.Electric Code <br />