My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20038
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:02 AM
Creation date
5/28/2019 11:50:13 AM
Metadata
Fields
Template:
Building Department
Company Name
CRESTVIEW HILLS
Building Department - Doc Type
Permit
Permit #
18-20038
Building Department - Name
HIERONS,JOHN & SALLY JO
Address
7951 MERCHANTVILLE CIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROCK-IT CLIP SS inSTaLL ■ -rr,,ra;;ie`.,: :si;n��rnatir�ns <br /> Yo. ",?ir,.ircrn <br /> @y@3 I <br /> 1 Locate all parts <br /> -Locate the Rock-It Clip SS,micro-inverter/power optimizer,and the section of the module frame in which <br /> you will be mounting the micro-inverter/power optimizer. <br /> See fig.A for acceptable mounting locations. <br /> 2 Install the Rock-It Clip SS <br /> • Slide the Rock-It Clip SS onto the lip of the module frame. <br /> • Slide the micro-inverter/power optimizer into the opposite lip of the Rock-It Clip SS. <br /> • Tighten the bolt to 150 in-lb minumum to clamp the Rock-It Clip SS to the module frame and the <br /> micro-inverter/power optimizer to the Rock-It Clip SS. <br /> • Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is <br /> tight against the clip flange to avoid rotation during tightening. <br /> ROCK-IT CLIP 2.0 1nSTaLL <br /> _,:! Inverter Flange <br /> Module Frame <br /> Rock-It-Clip 2.0 <br /> 1 Locate all parts <br /> -Locate the Rock-It Clip 2.0,micro-inverter/power optimizer,and the section of the module frame in which you <br /> will be mounting the micro-inverter/power optimizer. <br /> 2 Install the Rock-It Clip 2.0(See below detail) <br /> • Slide the Rock-It Clip 2.0 onto the lip of the micro-inverter/power optimizer. <br /> • Slide the micro-inverter/power optimizer into the opposite lip of the module frame. <br /> • Tighten the bolt to 150 in-lb to clamp the Rock-It Clip 2.0 to the module frame and the micro-iriverter/power <br /> optimizer to the Rock-It Clip 2.0. <br /> • Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is <br /> tight against the clip flange to avoid rotation during tightening: <br /> www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.