My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20038
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:02 AM
Creation date
5/28/2019 11:50:13 AM
Metadata
Fields
Template:
Building Department
Company Name
CRESTVIEW HILLS
Building Department - Doc Type
Permit
Permit #
18-20038
Building Department - Name
HIERONS,JOHN & SALLY JO
Address
7951 MERCHANTVILLE CIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Daniel W. DUnzik Architect LEED-AP <br /> 370 Burnt Hill Rd.Skillman, NJ.08558 908-872-3664 <br /> Studlogdesign@comcast.net <br /> June 21,2018 <br /> Zephyrhills, FL <br /> Attn: Construction Official <br /> Re: Proposed Photovoltaic Solar Panel Installation <br /> John Heirons <br /> 7951 Merchantville Cir. <br /> Zephyrhills, FL 33539 <br /> Dear Sir: <br /> Certification: I have reviewed the engineering testing reports for the racking and attachments to <br /> be used on this project and I certify that the products are capable of supporting the code <br /> required loads and are suitable for this installation when installed in strict compliance with the <br /> manufacturers printed instructions. <br /> Regarding the solar panel array installation on the above referenced project please note that <br /> An inspection was performed and analysis of the existing structure was conducted. There is <br /> adequate structural capacity for the installation of the array with the following <br /> recommendations: <br /> 1. The array will be installed on the existing roof. The roof is constructed of 2"x6"wood rafters <br /> @ 16" O.C. spanning 1 FT'with with intermediate supports at 1/3rd points making the <br /> effective longest span 9'6" 1/2" OSB plywood sheathing. The new array(See Site map by <br /> contractor)will add 2.63 Lb. / Sf overall to the roof.No additional structure support is required <br /> for the existing roof structure. <br /> 2. The system shall be secured to the roof using the "Ecofasten Solar" "Rock-IT" ®attachment <br /> system. The installation shall be in strict compliance with manufacturers printed instructions. <br /> The attachment system shall be UL 1703 approved tested. The attachments shall be min. 5116" <br /> x 4" long stainless-steel lags with a min. embedment of 3" into the rafters. Attachments shall be <br /> @ 48" o.c. Max. in roof wind zone 1 and @-24"o.c. Max. in roof wind zone 2 and 3 lags to <br /> alternate rafters. Provide 6 mil. vapor barrier between dissimilar metals. Provide water tight <br /> gasket and sealant at all penetrations. Attachments shall follow panel rows as specified by the <br /> system manufacturer's installation manual.The panel angle shall match the roof slope. <br /> Structural Design Loads per ASCE 7-10 <br /> -Dead Loads= 10 psf(+2.6psf,New Solar Panels)= 12.6 psf.-Live Load=20psf <br /> Total dead weight on attachment= 19Lb. Max. <br /> Ch. 30 Wind Loads Components and Cladding <br /> -windloads= 140 mph Exposure B zone 1=+/- 31.4 psf., Zone 2&3=+/-77.7psf. <br /> Area of Panels largest array=713.4sf <br /> Tributary area panels/attachment max. 713.4sf/89min= 8sf. <br /> Min Number of Attachments=89. <br /> Wind pressure 31.4 x Area 713.4/ 89 No. Attachments=622 <br /> TABLE 10.3.1 NDS Pull out strength of 5/16"x4" lags in rafter=W'=WxCdxCt=2661bs/in <br /> embedment x 3"embedment=798 xl.6Cd xl.00t= 1,276 Lbs Max. >6221bs/attachment OK <br />
The URL can be used to link to this page
Your browser does not support the video tag.