Laserfiche WebLink
Reference and Tips ` <br /> Proper Flashing Placement <br /> Additional tips and information for installing mounts: <br /> ® See Quick Tips videos on nail removal,bolt prep,and more at: <br /> http://www.quickmountpv.com/support/videos.htmi <br /> ® It is not necessary or advisable to use nails or other fasteners to secure the perimeter of <br /> the flashing. <br /> ■ The E-Mount is made to work with standard and high-definition composition/asphalt and wood <br /> shingle roofs with 5"to 5-5/8"courses. If the exposed surface of the course exceeds this measure- <br /> ment you may need to use our Classic Shake Mount instead. <br /> ■ Depending on the season and climate,size and location of seal tabs,and quality of the shingles, <br /> the seal tabs that adhere the shingle courses together may not effectively seal the shingles to the <br /> fleshings.If this is the case,simply add several quarter-sized dabs of manufacturer accepted sealant <br /> or asphalt roofing cement,meeting ASTM D 4586 Type II,between the flashing and the shingle <br /> above. <br /> ■ Mounts should not be installed in areas of the roof susceptible to ice damming.Water ponding un-. <br /> der the shingles can reach the bolt penetration. <br /> ® Take care not to damage the roofing material while working on the roof. Removing stone granules <br /> and deforming the shingles in any way can shorten the lifespan of the roofing.The value of the solar <br /> array is directly affected by the condition of the roof it is attached to. <br /> BI 7.2.3-26 May-2017 Rev 6 <br />