My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20105
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:40:11 AM
Creation date
5/28/2019 2:17:34 PM
Metadata
Fields
Template:
Building Department
Company Name
CROWN CASTLE GT COMPANY LLC
Building Department - Doc Type
Permit
Permit #
18-20105
Building Department - Name
CROWN CASTLE GT COMPANY LLC
Address
38522 A AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All <br /> Date: June 4,2018 s\ FL COA#31011 <br /> Emilio Castro Tower Engineering Professionals <br /> Crown Castle 326 Tryon Road <br /> 8000 Avalon Blvd, Suite 700 Raleigh, NC 27603 <br /> Alpharetta, GA 30009 (919)661-6351 <br /> Subject: Structural Modification Analysis Report <br /> Carrier Designation: T-Mobile Co-Locate <br /> Carrier Site Number: A2G0757A <br /> Carrier Site Name: N/A <br /> Crown Castle Designation: Crown Castle BU Number: 816298 <br /> Crown Castle Site Name: Zephyrhills <br /> Crown Castle JDE Job Number: 467549 <br /> Crown Castle Work Order Number: 1522943 <br /> Crown Castle Order Number: 412641 Rev. 1 <br /> Engineering Firm Designation: TEP Project Number: 26146.157540 <br /> Site Data: 38622 A Ave.,Zephyrhills, Pasco County, FL 33642 <br /> Latitude 28013'40.63", Longitude-82010'45.60" <br /> 288 Foot-Self-Supporting Tower <br /> Dear.Emilio Castro, <br /> Tower Engineering Professionals is pleased to submit this "Structural Modification Analysis Report" to <br /> determine the structural integrity of the above mentioned tower. This analysis has been performed in <br /> accordance with the Crown Castle Structural 'Statement of Work' and the terms of Crown Castle Purchase <br /> Order Number 1138238, in accordance with order 412641, revision 1. <br /> The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we <br /> have determined the tower stress level for the structure and foundation, under the following load case, to be: <br /> LC4: Modified Structure with Existing + Proposed Equipment Sufficient Capacity <br /> Note:See Table I and Table 11 for the proposed and existing loading,respectively. <br /> This analysis has been performed in accordance with the 2017 Florida Building Code, 6th Edition (2015 <br /> International Building Code) based upon an ultimate 3-second gust wind speed of 137 mph converted to a <br /> nominal 3-second gust wind speed of 106 mph per Section 1609.3.1 as required for use in the TIA-222-G <br /> Standard per Exception #5 of Section 1609.1.1. Exposure Category C and Risk Category II were used in this <br /> analysis. <br /> All modifications and equipment proposed in this report shall be installed in accordance with the appurtenances <br /> listed in Tables 1 and 2 and the attached drawings for the determined available structural capacity to be <br /> effective. <br /> We at Tower Engineering Professionals appreciate the opportunity of providing our continuing professional <br /> services to you and Crown Castle. If you have any questions or need further assljt n t i ny other <br /> projects please give us a call. \�1 /�� <br /> Structural analysis prepared by: Jessica R. Moebs, P.E./AJO \,NC ENS <br /> Respectfully submitted by: No. 77387 <br /> �. STATE OF <br /> Adam M.Amortnont, P.E. - %,;���•�� •oIORIOA i�,�'��� <br /> r/j j� 91VAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.