My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20167
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:45:53 PM
Creation date
5/28/2019 2:45:51 PM
Metadata
Fields
Template:
Building Department
Company Name
HIDDEN RIVER
Building Department - Doc Type
Permit
Permit #
18-20167
Building Department - Name
LENNAR HOMES LLC
Address
3011 MOULDEN HOLLOW DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building and Construction Services (BCS) <br /> C .-- <br /> COUNTY FLORIDA OPO-4 SPAS.1 S. 11HIR'ANT 1�IACE.S. � lower Door Test Report Form <br /> Property Address: Unitri /� <br /> k1 MOWd-f-v% kA tto w �j* . TJ <br /> Permit#: Oman Testing Company Name: �C <br /> Test Date: t Tester Name: 1 1 coz, ; I <br /> Ii TesterCert#: Contact Phone: 1 <br /> ��` Email: <br /> I <br /> h 402.4.1.2 Testing.Building envelope air tightness shall be demonstrated by Section 402.4.1.2 <br /> The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes <br /> per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).As required by <br /> the Building Official,testing shall be conducted by an approved third party.A written report of the results of the test <br /> 1 shall be signed by the party conducting the test (including Agency Name)and provided to the Building Official prior <br /> to Certificate of Occupancy issuance. Testing shall be performed at any time after creation of all scheduled <br /> penetrations of the building thermal envelope. <br /> i <br /> During testing:(check to verify condition met) <br /> ❑ Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended <br /> weather-stri ppi ng or other <br /> ❑ Dampers incl udingexhaust,intake,makeup air,backdraftandfluedampers shall beclosed,but not sealedbeyond <br /> intended infiltration <br /> ❑Interior doors,if i nsta I I ed atthe ti me of the test, s ha I I be open <br /> ❑ Exterior doors for continuous vent!lation systems and heat recoveryventiIatorsshaIIbeclosedand sea Ied <br /> ❑ Heating and cool ing systems,ifinstal led atthe timeof the test,shall be turned off <br /> I <br /> ❑Supply and return registers,if instal Ied at the time of the test, shaII befullyopen <br /> i Vb Building volume (ft3) _ , CCor Q..3 <br /> Q50 Airflow at 50 Pascal(CFM) _ ®S <br /> ACH50 Air changes per hour at 50 Pascal: <br /> Q50 x 60_Vb = - ACH50 (3.0 ACH minimum) <br /> Pass Fail ❑ <br /> 0 Outside Air mechanically introduced to space(less than 3.0 ACH) <br /> I hereby certify that the above envelope leakage pe7formance results demonstrate compliance <br /> ivith Florid Energy Code requir, ents in a cordance with Section R402.4.1.2. <br /> I , <br /> i <br /> ester date <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.