My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20170
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 6:37:33 AM
Creation date
5/29/2019 6:37:32 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVER OAKS
Building Department - Doc Type
Permit
Permit #
18-20170
Building Department - Name
MUTHIG,PHYLLIS & GARY
Address
6240 SILVER OAKS DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lowe's Project Profile Report <br /> LOWEIS• <br /> Project Type: Interiors Customer: Muthig,Gary <br /> Project Subtype: Kitchens Customer Phone: (813)780-8042 <br /> Store: 1854 Employee: Majirsky,James <br /> A, Project ID: 6907623 Print Date: 6121/18 9:37 AM <br /> General <br /> Kitchen Shape <br /> Galley <br /> Kitchen Style Traditional <br /> Budget $20,000-$25.000 <br /> Installation <br /> F <br /> Notes: Kitchen: <br /> Install new upper and base cabinets,new granite <br /> counter tops-bar at sink to be cut down and counter <br /> top extended over base to 42"wide at the same level, <br /> ALL WORI< 50/50 undermount sink w/soap dispenser,full <br /> 4beksplash as indicated on drawing w/Schluter edge.3 <br /> SHAL_ 1 10,W�m), <br /> t,2 chandeliers(tat dining room <br /> NCODES FLORIDA dA&rR&ns(I at breakfast table <br /> ArIONAL eL. Wth <br /> AND THe C, C7,Pd&J0(XJ; add new garbage disposal at <br /> 7"Y OF 3EPH <br /> OnDINANCiS Mastleyrftam: <br /> New vanity w12 sinks,2 faucets,new granitecoup'ar <br /> cou <br /> top,low splash as indicated on drawing,rernol'd full <br /> o <br /> wall mirror and tile wall to 60"height then' taII2 <br /> w <br /> mirrors onto tile above sinks,2 new s� y light fixtures WQveled mirror <br /> over mirrors,new recessed med <br /> door,new exhaust fan wAil t separate switches,2 <br /> new towel bars, I new tow !rnP nKe,1,1 new TP holder. <br /> REVIEW DATe replace all file around den tub,new pan&the on <br /> CITY OF ZEP�---,—i---, --==�hower mom floor.,p6w wall the in shower,ceiling will be <br /> done In texture re board instead of file,niche to be <br /> PLANS EXAMINER built on lei xtu e valve) <br /> 6 of wall, new shower valve kit, <br /> left <br /> e <br /> sho er�d000r!bull nose tile trim to match,new can <br /> w s ceil�il C fight in shower ceiling, new pocket door latch to <br /> stalled, <br /> be' stalled,new hinges and handles on linen and <br /> oset doors.GC to enlarge opening over shower door <br /> by cutting up to ceiling,new shower drain cap. <br /> Structural <br /> Notes: Kitchen: <br /> Reduce high bar counter at sink cab to one level <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.