Laserfiche WebLink
Single Family Dwelling <br /> Plan Review Comments <br /> 1.1 F.F.E. shall be a minimum:of.8"above.'the road.elevation:and an engineered site plan. <br /> 2.. Lots shall be graded-to comply with'R401.3 of the F.B.C. <br /> 3.' ;Compaction:test required if 24" or m6re:of fill dirt is brought in:di any one place: <br /> 4. Tie in survey required_before pouring concrete.: <br /> 5. Driveways require a-R.O.:W. use permit: All 4:sides of driveway thru the sidewalk shall have. <br /> expansion material.. <br /> 6. All setbacks shall be'met.. <br /> 7- ;All.propertymarkers shall be and marked at time of first inspection. <br /> -.8*. All A.D.A.-requirements shall*be met.. <br /> .9.. No electric,plumbing, mechanical;,or frairiing shall be covered without an inspection and <br /> approval first. : <br /> 10. All Garages shall comply_with:section R302:6:of the.F.B.C,::(Fire Separation). <br /> I L Appliances:shall not.be installed in.a locationwhere subject to mechanical damage unless. <br /> protected byapproved barriers. M303.4 of.the.F.B:C <br /> 12. Water heaters shall cotriply with section P607.3 of the F.B.C. <br /> 13. Foundation supports-for A/C.units shall-be raised at least 37-above finished grade.. M1308.1. <br /> 14._Return air in all:bedroorns..F.B.C. ,M1620.4, <br /> 15. Smoke detecfors are.to be installed in accordance-with:R313.1-of the F.B.C. <br /> 16::All glazing requirements are..to be in accordance with R308-A of the F.B.C. - <br /> 17. All means.of egress are to be in:accordaiicel with R31 Lof the F.B.C., .: <br /> 18. `.`Green gypsum board" shall not be used:as a backer in:showers'or tubs. R702.4:2 F.B.C. <br /> - <br /> 19. Combination-type AFCI breakers are required:at all.locations requiring an AFCI,type breaker: <br /> 20. Carbon monoxide.alarms:will.be required in new-construction that uses fossil-burniri :heating <br /> :or appliances or an attached garage.:- They shall be.installed in accordance with,the F.B.C. <br /> 21. All plumbing,mechanical, and electrical shall:be separate fromunit to:unit: This includes all. . <br /> underground plumbing and electric. <br /> 22. All 2016.N.E.Q. Codes will be enforced. <br /> -23.Tamper- Resistant Receptacles in„accordance with 40 J I of the 2016 N-.E.0 <br /> 24::In accordance:.with the Land..Development:Code lots.shall be sodded'before final at least 10 , <br /> feet around:the structure. <br /> 25.-Blower door test dnd.blown in insulation-bard shall be provided before C:O. :.. <br /> 26-A copy ofthe energy cdels shall be with permit at all times. <br /> 27. Copy of final insulation report shall be:pa�ovided with peri�tit before:fnaL <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6'Edition <br /> R.O.W.-Right of Way <br /> A. -A.-Americans.with Disabilities Act N.E.C.-National Electric Code(2011) <br />