Laserfiche WebLink
Se F Sing an�h :Y Dwe ing <br /> P h Review Comments <br /> 1: F.F.E. shall'be above.ther vn and' <br /> n an engineered site plan. <br /> - 2. Lots-shall be graded to.comply with R401.3 of the F.B:.C. . <br /> 3. Compaction:test required if24" or more of fill dirt is.brought-in at any one place. <br /> 4: Tie in survey-required before pouring concrete. <br /> 5. Driveways.require a R.O:W.use permit:' All•4 sides of driveway.thru the sidewalk shall have. <br /> , . _ <br /> expansion material: <br /> 6. All setbacks shall be met.. . <br /> 7. Ali property: ' arkers shall be.uricovered and marked at time of first-ins pection: <br /> . . <br /> 8: All A.D.A. requirements shall be met.: . <br /> 9. No electric;plumbing, mechanical,.or lfraffiina shall be covered without an inspection•arid <br /> approval first. . <br /> 10. All Garages shall:comply with section R302.6-of the F.B.C:, (Fire Separation). <br /> 11: Appliances shall not:be installed iri a location where subject to_mechanical damage unless <br /> proteded.by approved barriers. M303.4 of the F.B:C <br /> 12. Water_heaters shall comply with section P607,3 of the F.B.C.* <br /> 13. Foundation supports for.A/C units shall be raised at least 3'.' above finished grade. M1308.1 <br /> 14. Return air in all-bedrooms. F.B.C. M.1620.4 <br /> 15. Smoke detectors are to be installed:in accordance with R313:1 of the:E.B.C. <br /> M. All glazing..r u. .r.r. <br /> ements are:to be in accordance with R308.4.of the F.B:C. . <br /> 17. All means of egress are to be in accordance with R311:of the RB.C.. <br /> 18. "Green gypsum.board shall not be used:as a backer in showers or tubs. R702.4.2 F.B.C. <br /> 19. Combination-type AFCI•breakers are required-at all_locations requiring an AFCI.type breaker: <br /> 20. Carbon monoxide alarins:will be required in new:construction that uses-fossil-burning-heating, <br /> or appliances of' attached garage. They shall-lie_installed in accordance with the F.B.C. <br /> 21. All plumbing, mechanical,:and electrical shall:be separate from unit to unit: 1This-includes all. . <br /> underground plumbing and electric: <br /> 22. All 2016.N.E.C. Codes will be enforced. <br /> .23. Tamper= Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C . <br /> 24.1h accordance with the Land.Development.Code, lots shall be sodded before final at least 10 . <br /> feet around the structure. <br /> 25. Blower door test and blown in insulation card shall be provided before C.D. <br /> 26 A copy of the energy cacls.shall be with permitt at all tines. <br /> 2Z. Copy of final insulation-i'eport shall be:provided fvith:permit before,final, . <br /> 28. No fence:pool onscreen enclosure is.issued with this perntiz <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way. - <br /> A.D.A.-Americans with Disabilities-Act N.E.C.-:National Electric Code(2016) <br />