Laserfiche WebLink
' +1s m4 ,I <br /> When Bulldings Talk.We Listen. <br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING <br /> CONSTRUCTION <br /> Envelope Leakage Test_Report <br /> Prescriptive and Performance Method <br /> Project Name: J,oxlil P/ Builder Name: Z.eA1Ar42 14brAcx <br /> Street: 32 92 Permit Office: <br /> City, State,Zip: Gr,oxlye f,41el S' �� 33 540 Permit Number: Za i1!4 <br /> Design Location: Jurisdiction: <br /> Square Feet: /q34 Conditioned Volume: <br /> Envelo' pe Leakage Test Result <br /> Single'Point Test Data: <br /> HOUSE PRESSURE: —fib FLOW: gf <br /> Leakage Characteristics <br /> CFM (50): 19172 <br /> ffPass F]Fail <br /> ACH(50): 3.3 <br /> R402.4.'i.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air <br /> changes per hour in Climate Zones 1 and 2 ... Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 <br /> Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Slatuies or individuals <br /> licensed'as set forth in section 489A05(3)(f), (g), or(i)or an approved third party. A written report of the results of the test shall be <br /> signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all <br /> penetrations of the building thermal envelope. <br /> 9. Exterior windows and doors,fireplace and stove doors shall be closed, but not sealed,beyond the intended weatherstripping or other <br /> infiltration control measures; <br /> 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended <br /> infiltration control measures; <br /> 3.Interior doors,if installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off:and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open <br /> hereby certify that the above envelope leakage Where required by the code official, testing shall be <br /> )erformance results demonstrate compliance with conducted by an approved third-party. A written report of <br /> =lorida Energy Code requirements in accordance with the test results shall be signed by the third parts <br /> .ection R402.4.1.2.L conducting the test and provided to the code official. <br /> 19GNA URE: — zz:7� - <br /> aRINTED NAME: Wit// BUILDING OFFICIAL: <br /> ?.ATE: MATE: <br />