My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20487
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20487
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 10:02:54 AM
Creation date
6/4/2019 7:42:55 AM
Metadata
Fields
Template:
Building Department
Company Name
FLORIDA HOSPITAL ZEPHYRHILLS INC
Building Department - Doc Type
Permit
Permit #
18-20487
Building Department - Name
FLORIDA HOSPITAL ZEPHYRHILLS LLC
Address
6748 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project' Advent Health ROSS BRYAN ASSOCIATES, INC. Sheet No. 6 of 7 <br /> Model P/PE-15-NIL/IL-150 CONSULTING ENGINEERS Job No. 184652 <br /> By EOS ti3 NASHVILLE,TN Date 9/27/18 <br /> CHECK FOUNDATIONS: <br /> LRFD Load Combinations: 1.21)+W ASCE 7-10, Section 2.3 <br /> Resistance Factors: Opiain= 0.6 ACI 318-14 <br /> 0„= 0.75 ACI 318-14 <br /> (Db= 0.9 ACI 318-14 <br /> f,C = 2500 psi Pedestal Width = 0 ft Pedastal Height= 0 ft <br /> Pa = 150 psf/ft Pedestal Length= 0 ft Overburden = 0.83 ft <br /> qa= 12000 psf <br /> Total Service Wind Load: P,N= 3.29 kips <br /> Total Service Moment at Base: M = 30.47 k-ft <br /> Rectangular Spread Foundation: <br /> Length = 8 ft. Width= 4 ft. Depth= 3.25 ft. <br /> Dead Load, Pd= 20.77 kips <br /> Overturning Moment, M.= 45.56 k-ft <br /> Resistive Moment, Mr= 83.09 k-ft Mr/Mo= 1.82 > 1.5 O.K. <br /> Eccentricity,e= M/Pd= 1.47 ft. kern, k= 1.33 ft. e >k <br /> Bearing Pressure, qma„= 1366.78 psf < qa= 2000 psf O.K. <br /> Moment in Footing Mu= 47.31 k-ft <br /> Use 6 No. 5 Bars Top and Bottom - Length. <br /> Use 11 No. 5 Bars Top and bottom -Width. <br /> Moment Capacity, (DM,= 291.13 k-ft > M„= 47.31 k-ft O.K. <br /> Check Shear,V„= 2.18 kips/ft <br /> Shear Capacity, (D*V„ = 32.12 kips/ft > Vu= 2.18 kips/ft O.K. <br />
The URL can be used to link to this page
Your browser does not support the video tag.