Laserfiche WebLink
' When Buildings Talk,We Listen. <br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING <br /> CONSTRUCTION <br /> Envelope Leakage Test Report <br /> Prescriptive and Performance Method <br /> Project Name: Ai dde,, `I'vet/ Builder Name: 1-000 CfV'n4W'V-S <br /> 14�t Street: `)-Rg5 Iokoi r 4/0-v'P Permit Office: &"f at ze <br /> f r7 <br /> CI State Zip: e 1 Permit Number: <br /> �v, p � ��► Is,�L, 335�® 9- 5 <br /> Design Location: ; Jurisdiction: f(7-C)o <br /> Envelope Leakage Test Results <br /> Single Point Test Data: <br /> HOUSE PRESSURE: FLOW: f vG'G <br /> Leakage Characteristics <br /> C Pass Fail <br /> FM (50): <br /> ACH(50): <br /> R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air <br /> changes per hour in Climate Zones 1 and 2 ... Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 <br /> Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals <br /> licensed as set forth in Section 489.105(3)(0, (g), or (i) or an approved third party. A written report of the results of the test shall be <br /> signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all <br /> penetrations of the building thermal envelope. <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other <br /> infiltration control measures; <br /> 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended <br /> infiltration control measures; <br /> 3. Interior doors,if installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open <br /> hereby certify that the above envelope leakage Where required by the code official, testing shall be <br /> lerformance results Zdemonrate mpliance with conducted by an approved third-party. A written report of <br /> 'lorida Energy Code rnt i ccordance with the test results shall be signed by the third party <br /> ection R402.4.1. conducting the test and prov' ed to the code official. <br /> iIGNATURE: <br /> 'RINTED NAM BUILDING FF IAL: <br /> )ATE:0 3 Z?PZt l DATE: 49A P <br />