Laserfiche WebLink
When Buildings Talk,Vie Listen. <br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING <br /> CONSTRUCTION <br /> Envelope Leakage Test Report <br /> Prescriptive and Performance Method <br /> Project Name:HJJen lelvei( Builder Name: Lviric?i" <br /> Street: 3q5q3 7)qw,9c>n Cksc �i- Permit Office: C,I- J z e f2 r 11 ill,, <br /> City, State, Zip: Zcy 4 4,,11,51, F,�13 554 0 Permit Number: 7__0Q,21 <br /> Design Location: 2_� Jurisdiction: 0 114POC <br /> Square Feet: JT/ -7 Conditioned Volume: 1 r 53(P <br /> Envelope Leakage Test Results <br /> Single Point Test Data: <br /> HOUSE PRESSURE: FLOW: <br /> Leakage Characteristics <br /> Pass Fail <br /> CFM (50): <br /> ACH(50): <br /> R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air <br /> changes per hour in Climate Zones 1 and 2 ... Testing shall be conducted with a blower door at a pressure of 0.2 Inches w.g. (50 <br /> Pascals). Testing shall be conducted by either individuals as defined <br /> ed in Section 553.993(5) or (7), Florida Statutes or individuals <br /> licensed as set forth in Section 489.106(3)(f� (g), or(I) or an approved third party. A written report of the results of the test shall be <br /> signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all <br /> penetrations of the building thermal envelope. <br /> i. Exterior windows and,doors,fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other <br /> infiltration control measures; <br /> 2. Dampers Including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended <br /> infiltration control measures; <br /> 3.Interior doors, if Installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off,and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open <br /> I hereby certify that the above envelope leakage Where required by 'the code official, testing shall be <br /> performance results demonstr/to- 5PTpliince with conducted by an approved third-party. A written report of <br /> Florida Energy Code requir ais i c o dance With the test results shall be signed by the third party <br /> section R402.4.1. conducting the test and provided to the code official. <br /> SIGNATURE: <br /> PRINTED NAM t- do't-121in (111mf�(b 6`?q111VT1 BUILDING'nFF ILIA I[- <br /> 9,k) <br /> DATE: DATE: <br />