Laserfiche WebLink
LSD/Longitudinal Installation <br /> 1. Place and build pier as above <br /> 2. Use LSD hardware kit #59023 <br /> 3. Drill 3/8" x 3" Hole into concrete through holes in pan'on each longitudinal side of block pier <br /> 4. Place tie brackets on each side of pier, with the "flush" side of the tie bracket towards the block pier. <br /> 5. Put a washer and nut on each of the 3/8" x 3-1/2" wedge anchors. The nut should be screwed on enough <br /> to have one or.two threads showing on the top of the bolt. <br /> 6. Line up the hole in the inside tie bracket with the drilled holes in the pad & concrete and insert the <br /> wedge anchors. Using a hammer, tap the wedge bolts into the holes, through the bracket & pad, <br /> leaving the washer/nut flush with the bottom of the bracket. Using a 9/16" socket wrench, tighten the <br /> wedge/anchor bolt, securing.the tie bracket to the concrete. <br /> 7. Attach frame brackets to kbeam on each side of pier. <br /> 8. Attach strut to the tie bracket at base and I-beam brackets with bolts provided. Struts must be at.45' or <br /> less, tighten all bolts/nuts. <br /> LSD/Longitudinal -Lateral Strut Combo <br /> Concrete <br /> Pa d <br /> y 1. <br /> 5° sa Concrete <br /> i <br /> f/Call Mobile Home Parts Pro for product information at 844-647-8673 N <br />