Laserfiche WebLink
r-merald Pointe lot improvement approval cover letter <br /> Project Name: <br /> Lot#: Address: 31J <br /> You have been approved for your lot improvement request by the Board of <br /> Directors. Please be sure to Teview your application copir to see if theire are any <br /> notes and changes mrith.this approval. <br /> 114 any of the boxes are checked below you need to address these issues befOre <br /> proceeding-,with your project, or when your project is completed. <br /> City building permit, aiways check-.pAth the city to see if a permit is necessary. <br /> ) Call DIG 18111 if you are doing any groundwork. <br /> rovide lot improvement committee with a copy of the city permit and drawings. <br /> ) When project is completed you must turn in the green permit for final inspection. <br /> Remnembeff.if there are any changes�n Ifoug,Mans-Rhev must, foe Sul-OMMed befoFe you <br /> cap.continue 17aur prip7oed. <br /> it you have any q�-,essidons or concerns about your project please contact the lot <br /> improvement committee or The Board of Directors. <br />