Laserfiche WebLink
Q <br /> a„ <br /> f <br /> Plan Review <br /> Modular Home Set-ups and Aluminum Packages <br /> 1)All property markers shall be exposed and clearly marked at time of first <br /> inspection. <br /> 2) All setbacks shall be-met. <br /> 3)All garages shall comply with section 309.2 (Fire separation ): <br /> 4)Access shall be made available at time of'inspection. <br /> 5) 1Vlanu,facture specification manual, approved plans and permit shall be available at <br /> time of inspection. <br /> I <br /> 6).No electric, plumbing, mechanical or framing is to be.covered without inspection and <br /> approval first. <br /> 7) R.O.W.. Use permit required for driveways on public streets. <br /> 8) At least 10' separation between other units in unplatted locations. <br /> 9) All work shall comply with the F.B.C; 6tn edition and the 2014 N.E.C. <br /> 10) Clean.=outs shall be installed per code. <br /> R.O.W. - Right Of Way F.B.C. - Florida Building Code <br /> N.E.C. - National Electric Code <br /> i <br />