My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20514
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:59:38 AM
Creation date
6/5/2019 7:59:37 AM
Metadata
Fields
Template:
Building Department
Company Name
HIDDEN RIVER
Building Department - Doc Type
Permit
Permit #
18-20514
Building Department - Name
LENNAR HOMES LLC
Address
2971 MOULDEN HOLLOW DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7" <br /> Buildin-and Construction Services(BCS) <br /> PASC �4 <br /> COUNTY FLORIDA-, Blower Door Test Report Form <br /> 01,Fs", <br /> Property Address: <br /> o19-71 MovVen tkito Or%-VP— ?-P-9hyrWIkI.5, F-I 3 35-L-10 5-(0 <br /> Permit M Testing Company Name: Skyetec <br /> Test Date: 3 A5-/l-I Tester Name: Jeffery Morford <br /> Tester Cert#: Contact Phone: <br /> WTLD7R 904-903-0660 <br /> Email: <br /> jmorford@skyetec.com <br /> 402.4.1.2 Testing.Building envelope air tightness shall be demonstrated by Section 402.4.1.2 <br /> The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes <br /> per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). As required by <br /> the Building Official, testing shall be conducted by an approved third party. A written report of the results of the test <br /> shall be signed by the party conducting the test(including Agency Name)and provided to the Building Official prior to <br /> Certificate of Occupancy issuance. Testing shall be performed at any time after creation of all scheduled penetrations <br /> of the building thermal envelope. <br /> During testing:(check to verify condition met) <br /> E6xterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended <br /> weather-stripping or other <br /> E(Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond <br /> 2/tended infiltration <br /> Interior doors,if installed at the time of the test,shall be open <br /> V21"Er. erior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed <br /> Mea ,ting and cooling systems,if installed at the time of the test,shall be turned off <br /> U/sup-Ply and return registers,if installed at the time of the test,shall be fully open <br /> Vb Building volume(ft 3 /S. 0 <br /> Q50 Airflow at 50 Pascal(CFM) <br /> ACH50 Air changes per hour at 50 Pascal <br /> Q50 x 60—Vb== s,q ACH50(3.0 A CH minimum) <br /> Pass Fail M <br /> Outside Air mechanically introduced to space(less than 3.0 ACH) <br /> I hereby certify that the above envelope leakage performance results demonstrate compliance <br /> with Florida Energy Code requirements in accordance with Section R402.4.1.2. <br /> Signature of Test ff Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.