NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed";restrictions°,
<br /> which may be more'restrictive than County.regulations. The undersigned assumes responsibility:for corripliance;with any '.Y
<br /> applicable deed.restrictions: ,,;
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: " If the• owner has'hired a contractor orr
<br /> contractors to undertake work;.they may be required`to be licensed.`in accordance:-with-state.and local;regulations, 'If the
<br /> contractor is not licensed as required.by.law,,both the ownerand contractor may bie cited-fora misdemeanor violation
<br /> understate law.. If:the owner or inte' nded`contractor=are uncertain.as-to-,what.licensing requirements::may.apply-for:the
<br /> intended work, they are advised to contact the Pasco.County'Buiiding Inspection Division-Licensing Section at 727-847-
<br /> 8009: Furthermore, -if the owner has hired�a contractor or contractors,. he.is..advised..to..have tfie contractor(s)'sign; "
<br /> portions of the "contractor Block" of thisapplieation forwhich they-will be responsible.- ]f-you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting;;privileges..,in Pasco
<br /> County. - - -
<br /> TRANSPORTATION.IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands::
<br /> that Transportation Impact Fees and_Recourse::Recovery'Fees m"ay apply to"the construction of new.buildings, change-of
<br /> use in existing buildings, or expansion of existing buildings; as specified in Pasco County Ordinance number 89707.,.and, ._
<br /> 90-07, as amended: The undersigned'-also,understands, that such fees, as may be due;Will--be-identified at the time'of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource.Recovery Fees must be paid prior:to
<br /> receiving a "certificate of occupancy" orfinal power release: If the,:project does not involve a°certificate of occuparicyor
<br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer:Impact
<br /> fees are due, they must be;paid prior to permit issuance in accordance with applicable Pasco County ordinances:
<br /> CONSTRUCTION LIEN.LAW(Chapter_713, Florida Statutes, as amended);,;If valuation of work'is$2,500:00 or-more, I
<br /> certify-that I, 'the applicant;-have'been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide".prepared by,the.Florida Department of Agriculture and Consumer_Affairs. If the applicant is someone
<br /> other than the"owner", I certify that I have:obtained a copy of the above described document-and promise in good faith to
<br /> deliver it to the"owner" prior to commencement:
<br /> CONTRACTOR'S/OWNER'S-AFFID'AVIT:-:-I:eertify that,all.-the.�information in-this�application-is accurate,and that all work
<br /> will be done in compliance with all applicable.,laws.,regulating_construction, zoning and'land development. Application is
<br /> hereby made to obtain a permit to do'work Wand installation as irid'icated. ;•I..certify that no work or installation has
<br /> commenced prior to"issuance,,of.a.permit and that all work will be.performed to meet standards of all laws regulating
<br /> construction, County and City.codes, zoning.regulations, and land'development regulations in the jurisdiction. I 'also
<br /> certify that I understand that the regulations of other government agencies may"apply to-the intended work, and that-it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such'agencies include but are not limited to:
<br /> Department of Environmental Protection-Cypress Bayheads, Wetland"Areas and Environmentally Sensitive
<br /> Lands,WaterMlastewater°Treatment. i
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks;Navigable Waterways.
<br /> - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic.Tanks. ;
<br /> - US Environmental Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways.
<br /> I understand that the following:restrictions apply.to the use of fill:
<br /> Use.of.fill'is.not.allowed'in'Flood Zone W" unless expressly permitted.
<br /> If the fill material is to be used in` Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating--volume"will.be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by.the State of Florida.
<br /> If the-fill material- s:;to be used in.Flood Zone. "A" in connection with a permitted building using stem wall
<br /> construction,J certify.that fill will be used only to fill the area within the stem wall.
<br /> If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties: If use of fill-is found to adversely affect adjacent properties, the-owner may be cited for violating
<br /> the conditions of the building permit issued underthe attached permit application, for lots less than one (1)
<br /> acre whiofi are'elevated by fill;an engineered drainage plan is required.
<br /> If I am the AGENTfOR THE OWNER, I promise-in good faith"to inform'the owner of the permitting conditions set fdrth'in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells pools, 'air conditioning, gas, or other installations not specifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter;_�or.
<br /> set aside any provisioris.of the technical codes, nor shall issuance of a permit prevent.the Building Official from thereafter
<br /> requiring a correction of errors in.plans, construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by_such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6)months after the time the work ispommenced. An extension
<br /> may be requested, in writing, from the.,Building Official fora period not to exceed ninety(90) days and will demonstrate
<br /> justifiable cause for the extension. If-work ceases for ninety(90)consecutive days, the job is considered abandoned!
<br /> WARNING TO-OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOMMPROVEMENTSt___ '_UR PROPERTY. IF Y U INTENDTO OBTAIN FINANCING;CONSULT
<br /> -WITH-YOUR LENDER OR Ah-A-tTORNEY.SEFORE_IREC.OItDING'Y U NO34CE OF COMMENCEMENT.
<br /> FLORIDA JURAT(F.S.117.03) --� - —_—
<br /> OWNER OR AGENT CONTRACTO
<br /> Subscribed and sworn to(or affirmed)before me this' Subscribed and sworn or-affirme before me this
<br /> by Il-��I by 0`1' I.ICA/ -1 A-� L .
<br /> Who Is/are personally known to me or has/have produced W Is/ personally known to me or has/have produced
<br /> as Identification. L• f1xr s(4'U h as identification.
<br /> NotaryL
<br /> Public /�J-� -Notary Public
<br /> ry
<br /> Commission No. Corn iss' n N .
<br /> Name of Notary typed,printed or stamped Name of oE�gt ty ed,�
<br /> so ES
<br /> '* := Commission#FF 150422
<br /> Expires December 12,2018
<br /> ' Bonded Thm Troy Fain Insumnca 9' Y 00-355.7019
<br />
|