Laserfiche WebLink
Insulated Cover Installation Guide <br /> 1. Install Wall Header <br /> A. Select mounting area on wall. Snap a level <br /> chalkline along the wall to locate the bottom <br /> of the wall header. Remember,for proper House <br /> drainage,the panels must be installed at a <br /> minimum 1/2"slope per foot of projection. <br /> B. Cut wall header to length. Level extrusion Optional: <br /> and mark position. Apply Caulk at <br /> C. Run two beads of caulking along the back Caulk top of header, <br /> surface of the box header where it will -------. if en o ug h <br /> meet the existing building or fascia board. room is <br /> Extruded header is recommended for available. <br /> maximum strength. <br /> D. Position the header against the existing <br /> building and secure into place using two#10 <br /> x 2"hex head screws every 12"on center. If <br /> attached to 1"fascia board,use two#10 x 2" <br /> hex head screws. If attached to a masonry <br /> wall,the header should be fastened with one <br /> 1/4"diameter masonry anchor every 16"on <br /> center. If enough room, apply a heavy beadzr,-I��oopt7ional. pply <br /> of caulking along the top of the header to caulk at top of <br /> insure a water tight seal. header, if enough <br /> room is available. <br /> 10 ell, Caulk <br /> Mobile Home <br /> Optional- <br /> Apply caulk <br /> at top of <br /> Caulk header, if <br /> enough <br /> ------- room is <br /> available. <br /> -2- <br />