My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19674
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2019 8:38:30 AM
Creation date
9/18/2019 8:38:28 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
18-19674
Building Department - Name
DOERR,MIKE & POE,ANNA
Address
5125 2ND ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- � � Insulated Cover Installation Guide <br /> S. Install Snap-N-LocW" Panels <br /> A. Place the first panel into position with the female G. Repeat with each new panel until finished. The <br /> side facing the outward perimeter of the structure. last panel should be squared off on the male side <br /> To avoid scratches on the interior side you have two prior to installing to accept valance.Then fasten <br /> options: remaining#10 screws or 1/4"bolts to beam(s). <br /> 1.)Roof panels can be lifted over the beam(s)top side (If panels need cleaned,use soap and water.) <br /> down,and then turned over when in position. H. After all roof panels are installed,run a bead of <br /> 2.) Cardboard end caps or carpet pieces can be sealant where the top edge of the wall header <br /> draped over the beams(s),so that the panels don't meets the panel. <br /> brush against the metal surface. Check the panel for <br /> proper depth in the header and square up to support Sealant Press ealant Reservoir <br /> beams(s). ° seal°r <br /> r Sealant <br /> -� o <br /> B. Fasten panel to the top and bottom of the box header <br /> with#8 x 9/16"Tek screws 8"on center. J° c ° <br /> J <br /> °t t J • <br /> C. Fasten panel to beam(s)with 410 hex washer head ° r r <br /> screws long enough to penetrate 1"into the beam. <br /> The sheetmetal screws should be used in conjunction <br /> with a 1/4"x 1-1/2"aluminum washer with neoprene , <br /> backer. When going into wood framing a 1/4"x 6" <br /> lag can be substituted. Fasten the starter panel on the <br /> side and the outside corner only. <br /> Note: The panel must be free on male edge to Male <br /> snap properly, and screws should not be (push from <br /> placed within 4"ofpanel seam. `�\\ this side) <br /> D. Run a bead of sealant/ <br /> adhesive down the <br /> top channel of / <br /> the male side in Leave the fasteners\ <br /> closest to male side at <br /> the sealant reservoir, front untightened so <br /> making sure there are no Header-#8 hex next panel will snap <br /> head tek screws properly. <br /> air bubbles/pockets.We <br /> recommend using Pro <br /> Seal 7500. Female b <br /> E. Insert the second Start with female <br /> side facing the <br /> panel into the header outward perimeter <br /> in a level position of structure. <br /> with the starter panel, <br /> using proper handling slab <br /> techniques to avoid <br /> scratches. <br /> F. Position panel. Bump <br /> panel together until it <br /> snaps,bumping from <br /> header to overhang. <br /> Panels should be snapped together fairly <br /> soon after caulking is applied to reservoir. <br /> Wipe down top seam of panel to smooth caulk. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.