Laserfiche WebLink
r <br /> 1 <br /> cat <br /> s r <br /> CITY OF ZEPHYRIIILLS-BUILDING DEPARTMENT <br /> DATE: 5/15/2018 RIGHT-OF-WAY USE PERMIT PERMIT# (i <br /> No construction under ground or above ground ofany facility shall be accomplished on any City Rights of way without written approval from the <br /> City Building Department.Any application for approval of construction operations on any City owned Rights of Wry shall furnish a detailed drawing <br /> Showing the complete scope ofthe pmpmed work in triplicate to the office ofthe Building Official for approval prior to thecommwcemsat ofany work.A <br /> copy ofthis permit is to be kept readily available at the site of theworkat all times. <br /> PARCELLD.0 East of 11-26-21-0010-15300-0260 CITY ROAD 7TH STREET <br /> DATE &t&wla <br /> LOCATION(Legal Description): <br /> East of CITY OF ZEPWRHILLS PB 1 PG 54 PART OF ABANDONED RR DEBC AS A STRIP OF LAND 20D 00 Fr WIDE 100.00 FT WIDE ON EACH SIDE CENTER <br /> LINE OF ROADBED GRANTORFORMER MAIN TRAC SAID STRIP BEING BOUNDED ON SOUTH BY 5TH AVE ON NORTH BY6TH AVE ON EAST BY TTH ST EAST , <br /> 6 ON WEST BY US 301OR 4874 PO 683 <br /> Permission is hereby granted to Darryl Foshee of Duke Energy Ft. <br /> for the construction and mainteasnreaf- <br /> Installi 7 45'vootl I inthenold f,uy on thetsid of7lh Street inf vA DuNe Enem overhead 3 chasa One,appms 60'north of the intersection of <br /> Tin Street end 5th Ave. <br /> _subject to the following conditions: <br /> 1.The construction and maintenance oraach utility shall not interfere with the property and rights era prior occupant <br /> 2. All work shall be done in keeping with the standards ofthe City Streets Department and under the supervision ofthe City Building Official,who <br /> will be notified at least one day prior to commencement orconstructian. <br /> 3. All material sad equipment.ball besubject to inspection by the City Building Official. <br /> 4. During construction all safety regulations ofthe Department ofTranspartation shell beobsemed and the City shall be relieved ofall <br /> rapomibility from damage of any nature arising from this perm m term <br /> it.Subject to the sae ter and conditi safe tins,the permit holder may take such ty <br /> measure,iactuding plating mad display alienation signs,.it may dcnsa,accessary In conduct of construction and maiatenaamwt rk hereunder.It l the <br /> responsibility of the permiltee to M? <br /> S. All private and all City properly shall be restored to its original condition as far as practical in the opinion of the City Budding Official. <br /> d.All underground crossing Installations shelf he laid at such depth as maybe specified by the city Building OfBdal. <br /> 7. The sketch covering the details ofthl installation shall he made apart of this permit.This permit is granted with the understanding that the <br /> applicant has notified all other utility users in the area covered by the permit and takes fall responsibility for any damage lowered by prior installations as a <br /> result of his operations in order that they may sure guard their interests. <br /> & Itisaspraslystipulatedthatthlpermitlalicense for permissive use only and that the placing or facuitim upon public property pennant to <br /> this permit shall not operate to create or to vat any property right in said holder, <br /> % Whenever ,the City deddes to further esplott the City Rights of Way,any or ail said poles,wire,pipes,cables,or ether facilities aad <br /> appurtenances authorized ber ,a nder,shall be immediately screwed from said Rights of Way,or reset or relocated thereon as required by the City Building <br /> Official at the expense of the holder of this permit. <br /> 10.The holder shall save and keep the City harmless team any and ell damages,claims,or injuries that may occur by reason of the construction, <br /> mainleaanee,and aperntioa otsaid facility. <br /> 11.The bolder sholl complete the requested work within 90 days or this permit shall become null and void.In the sweat the work <br /> requested Is not completed upon the expiration date of this permit,the City shall have the right to complete such work and to charge the holder of the permit <br /> for all costs incurred in completing mid work <br /> IL The holder shall post a cash or surety bond with the City Manager in the sum of$ dollars to guarantee performance oftbe <br /> obligations barrio,and to guarantee..letan.ace orthe right-or-ay described herein for a period of one(1)year following completion of the requested <br /> imudialiom In the event a surety bond Is posted,the surety bond shall be made payable to the City and shall obligate the surety to hold the City harmlas in <br /> the event the holder of this permit should fail to meet any of its obligations hereunder.The bond shall also indemnify the City far all court costs aad <br /> reasonable attorneys fees in the event legal action Is required to collars on said bond. <br /> SUBNE=ED BY: <br /> (Perri Duke Energy FI. <br /> Signature&Tide XMI-fojh62 Sr.Engineering Technologist <br /> Address 36453 Eiland Btvd,Zephyrhills,Ft.33541 <br /> APPROVEDBY: <br /> CITY OF ZEPBYRIIILLS <br /> ' Buildfng0>rcial <br /> Date <br /> Utilities Supervisor_s// <br /> Date:_ C-` <br /> Puhtiewarks f <br /> Daft <br /> City Manager <br /> Date: <br />