Laserfiche WebLink
Rule 14-46.001 F.A.C. Florida Department of Transportation Dec 14,2016 <br /> Pagel of 3 UTILITY PERMIT <br /> PERMIT NO: 2018-H-798-268 <br /> STATE ROAD INFORMATION <br /> County: Section: State Road No: Beginning Mile Post: Ending Mile Post: <br /> PASCO 14090000 54 17.81 19.36 <br /> APPLICANT INFORMATION <br /> The Utility Agency Owner(UAO)shall be identified in this Applicant Information Box.When the UAO is a City or County and desires to have the Utility <br /> Builder make a joint permit applicant,as prescribed in Section 2.1(4)of the 2017 Utility Accommodation Manual(UAM),the Utility Builder shall also be <br /> identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint <br /> applicant. <br /> Utility Agency/Owner MAO) Utility Builder(only applicable when the UAO is a City or County) <br /> Name: TECO Peoples Gas(CU Tampa) Name: N/A <br /> Contact Person: TECO Peoples Gas(CU Tampa) Contact Person: <br /> Address: 1400 Channelside Drive Address: N/A <br /> City: Tampa City: N/A <br /> State: FLORIDA State: N/A <br /> Zip: 33605 Zip: N/A <br /> Telephone: (813)275-3731 Telephone: <br /> Email: ckuria@tecoenergp.com Email: <br /> WORK DESCRIPTION <br /> The Applicant(s)requests permission from the Florida Department of Transportation(FDOT)to construct,operate,and maintain the utilities as described <br /> below and as depicted in the incorporated documentation. <br /> Proposed installation of 15,935LF of 4"plastic natural gas pipeline along the north right of way of SR54,starting just after Bough Rd.running east, <br /> crossing SR41 to 7th St.,in Pasco County,Florida,via horizontal directional drill.Operating pressure of 60psig. <br /> Utility Work No:#615-TECO SR54 <br /> Additional sheets are attached and are incorporated into this permit Yes❑ No <br /> For FDEP certification,the FDOT agency report is attached in accordance with UAM Section 2.4.1(13) Yes❑ No <br /> TRAFFIC CONTROL(TCP) <br /> ®The TCP will comply with the following 600 series index(es) 612,613,616,660 <br /> ®A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2 <br /> MOT Technician's contact information(may be supplied at the two(2)business day notification to FDOT.): <br /> Name: Telephone Email: <br /> COMMENCEMENT OF WORK <br /> The UAO and/or Utility Builder shall commence actual construction in good faith within sixty(60)calendar days after approval of the permit application.If <br /> the beginning date is more than sixty(60)calendar days from the date of approval,the UAO and/or Utility Builder must review the permit with the FDOT <br /> Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit's continued approval.The UAO <br /> and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated. <br /> Anticipated Start Date:9/17/2018 <br /> Calendar days needed to completed: 180 <br /> ra <br /> r ;sue sycW:. <br /> {.s <br />