Laserfiche WebLink
ZEPHYRHILLS FIRE"DEPARTMENT <br /> 38410:6th Aye:Zephyrhills;*FL: 335"42 <br /> "FIRE SERVICE'USER FEES: increase 1/1/2018 <br /> Occupancy No.: <br /> Plan No:: " Contractor: <br /> Business:Name:..: Billing Address: <br /> Business Address:: <br /> Business Phone No.: :Billing Phone:No::" <br /> Business Fax No:: Billing Fax No.: . <br /> Contact:' Contact:: ' <br /> "PLAN REVIEW FEES INSPECTION-FEES PERMIT FEE <br /> Annual " <br /> Education,healthcare,De <br /> tention&Correctional Public <br /> Assembly,Business,. schools,- <br /> Storage, CFire <br /> Storage,'Mercantile and ChurchesSite Plan " " N/C Industrial. no charge $50- <br /> Multi-Family/Commercial " .03 sf" up.to 800 sq ft $" 24.00 $5(Minimum Char�ge$24.00� : 801.-1,500 sq ft: $ 34.52 0. <br /> Plan ReAsiond� BL 1,501 -2,500 sq ft $: 60:02" $502,501'3,500 sq ft $ :9002 •. $50 <br /> ,/SPRINKLER"SYST MS 3,501-5;000 sq ft° $- :1.27.52 . LP Gas $50 - <br /> 0.-25 Heads $50 5,501-7,500 sq"ft $: 187.52: Natural-Gas . $50": <br /> �26"plus Heads 0 7;501'10,000 sq ft $" 262.52 Fuel.Tanks- pertank ` $50 <br /> 1 . <br /> \'`STANDP.IP&SYS EM" 10;001=15;000 sq ft $ 375..02 Sparklers $100 . <br /> Per Riser $50 1,5,001-20,000 sq ft $. 525.02 Fire Works $500 <br /> ..._ . <br /> FIRE PUMP"- 20,001-30,000 sq ft $ 750:02 Camp Fire(recreation".$25 - <br /> Per.Pump $100 . 30,001-40,000 sq ft $,.1;050.02.: Controlled Bum(15da $100. <br /> �" <br /> FIRE ALARM SYSTEM. 40,001-60,000 sq ft '$.1,500.02 Hood/Duct $50 <br /> 0-25 Devices. .. $50 60,001-80;000 sq ft: $ 2,100.02 Place of Assembly :$50 Annual <br /> 80,001-($2,100.02)per <br /> 26 plus Devices: $100 ea add 1,000sq ft" $ M6" . Fire Protection $25': . . <br /> SUPPRESSION SYSTEMS (Business"closed until Flammable Application $50 Annual <br /> Wet. $50 violations corrected) Waste Tire Storage. $50 Annual <br /> Dry" . . .$50. SPRINKLER SYSTEMS-.,' Generator<KW. ." $100 <br /> CO2" $50 Hydro Undergrounds grounds $45 -. Generator>30 KW .:$100 <br /> Other. $50- Hy fostatic Test" $65� persystem: Bio-Hazard"Waste: .$100:Anneal <br /> KITCHEN EXHAUST- Acceptance Test" $45' Per system _ Fumigation Tenting $50' <br /> Hood/Ducts $50' ".Hylant Flow,'. 5 Torch Pot/Applied $50 <br /> OTHER Haz.Materials" $50 Annual" <br /> BLP Installation per tank $50"- FIRE ALARM SYSTEM . <br /> Fuel Tank Installation " $50_ System Acceptance $50 <br /> (Per Tank) $50 Recall_Acceptance , $56 <br /> Natural Gas Installation $50" - OTHER . <br /> (Per System): Fire.Wall/Smoke Wall $15 ,.Oerwgll; ., <br /> Spray Booth $50 LP"Gas $25 pertank <br /> Natural Gas $25" per system <br /> Tent 10'z10'or greater $15" per tent. <br /> Fire Pump $45 " l. <br /> Fire Suppression"" $30 <br /> S ystem Acceptance . <br /> "Exhaust Hood/Duct $30 <br /> Re-inspection DBL " <br /> (other than annual). : . <br /> Inspection scheduled DBL <br /> and cancelled less than <br /> 24.hours: <br /> Construction Insp: N/C . . . . . . . . . <br /> Emergency Vehicle Acce $50.. <br /> -PLANS TOTAL INSPECTION TOTAL !`�S PERMIT TOTAL <br /> GRAND.TOTAL .: <br /> c <br /> 5• : : . <br /> Comments: <br /> Dater 3o r fi Inspector: <br /> see <br /> back, <br /> nlr, . . . <br />