My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20283
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2019 10:13:07 AM
Creation date
9/18/2019 10:13:05 AM
Metadata
Fields
Template:
Building Department
Company Name
HAZEL HEIGHTS
Building Department - Doc Type
Permit
Permit #
18-20283
Building Department - Name
IBARRA-QUEZDA,ESTABAN
Address
5540 23RD ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I � u <br /> P E A K Johns Manville JM Peak Advantage Guarantee Charges and Requirements — Single.PlyI A D VANTAGE Effective 5/30/2013 <br /> JM TPO Fully Adhered Membrane Systems <br /> Term Price Type, Insulation( Cover Board617 Membrane Seam Fleshings Notes Wind Haile Puncture , <br /> (Yrs.) (US$1S0) _ Thickness Method Riders . Rider+ Riderm " <br /> Invinsa or . <br /> ENRGY3 or 45,60,80, Hot Air Same as <br /> New RetroPlus or Yes with 60 Mil Yes with 60.Mil <br /> " Approved Cover.Board' FB 115,FB 135 Weld Feld" <br /> $4 JM SECUROCK '100 Membrane and Membrane,and <br /> 5/10 ($350 Min.) MPH Cover Board Cover Board <br /> Invinsa or FB Membranes May Be Adhered with <br /> `ENRGY:3 or" 45,60,80, Hot Air Same as (2°Max.) ,(16 or 32 HrsJYd <br /> Re-Cover•' RetroPlus or. JM RSUA Directto Approved'Substrates. <br /> fi Approved Cover Board, FB 115,FB 135. Weld .Feld. <br /> JM SECUROCK Proper Prep-of all substrates'required <br /> Invinsa or <br /> (Required)"' RetroPlus or 45,60,80, Hot Air Same as <br /> New ENRGY 3(Re <br /> q FB 115,FB 135 Weld Field Yes with 60 Mil Yes with 60 Mil <br /> $7 JM SECUROCK 100 Membrane and Membrane and <br /> 15 ($500 Min.) MPH Cover Board Cover Board <br /> Invinsa or FB Membranes May Be Adhered with <br /> Re-Cover(11 ENRGY 3 or RetroPlus or 45,60,80, Hot Air Same as JM RSUA Directto Approved Substrates"). <br /> (2°Max.) 06 or 32 HrsJYd <br /> Approved Cover Board JM SECUROCK FB 115,FB 135 Weld Field Proper Prep of All Substrates Required <br /> i <br /> New ENRGY3(Required)�'�. Invinsa or 60;80,FB'115'- Hot Air Sameas„ <br /> JM SECUROCK FB 135- Weld Feld Yes with Cover' . .' Yes,with <br /> $10 ..'. 100. <br /> 20 Board Cover Board•, <br /> ($700 Min:) Invinsa or MPH. .(2°Max.) (16 or 32 HrsJYi <br /> Re-Cover+�� ENRGY3;or RetroPlus or 60,80,FB 1.15, Hot Air Same:as. Moisture Scan or Remove Roof Cover and <br /> Approved Cover.Board•. FB 135 Weld Feld, Replace Wet Insulation ' <br /> :JM SECUROCK <br /> Invinsa or <br /> JM SECUROCK Hot Air Same as <br /> $12 New ENRGY 3(Required)") JM <br /> Unless 80,FB 135 Weld Field 100 MPH Not Available <br /> 25 ($1,000 Min.) ENRGY 3 25 PSI) <br /> Re-Coven41 Not Available <br /> Invinsa or Hot Air Same as <br /> New ENRGY 3(Required)(11 JM SECUROCK 80,FB 135 90 MPH Not Available <br /> $15 Weld Field <br /> 30 ($1,500 Min.) (Required) i <br /> Re=Cover Not Available <br /> NOTES: <br /> All wind,hail and puncture riders are available for an additional charge.Reference (3)Pinnacle/Summit options available.Please contact local sales rep for details. <br /> individual wind,hail and puncture rider pages for system requirements and charges. (4)Refer to the NRCA Roofing and Waterproofing Manual,Volume 3 Reroofing Part 1, <br /> Non-JM metal may be included in the standard JM Peak Advantage Guarantee at no Section 4.3.6—Existing System Preparation for guidelines on how to prepare and <br /> charge for Pinnacle and Summit contractors or for a$2.00 per lineal foot upcharge for re-cover over various existing roof systems.Please Contact Guarantee Services for <br /> Peak contractors. project-specific requirements.Insulation may be mechanically Fastened or adhered <br /> (1)JM systems require either one layer of ENRGY 3 or an approved JM cover board with an approved urethane adhesive.Use of urethane adhesive requires moisture <br /> unless Fleece-Backed Membrane is adhered with JM RSUA.The use of Fleece- scan and approval of Substrate by JM Guarantee Services. <br /> Backed with RSUA is limited to 10-year guarantees or 15-year guarantees for 'SECUROCK is a trademark of USG Corporation <br /> Summit and Pinnacle contractors.The use of JM SECUROCK in a single layer <br /> is limited to 15-year guarantees or 20-year guarantees for Summit and Pinnacle <br /> contractors.See individual listings for specific requirements. <br /> (2)All riders require prior written approval of the system requirements from <br /> JM Guarantee Services. RS-2356-7 B-13(Replaces 7-13) <br />
The URL can be used to link to this page
Your browser does not support the video tag.