NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed°restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED,C*ONTTRACT'+OR o AND CONTRACTOR RESPONSIBILITIE;�: If the owner has hired a contractor or
<br /> contractors to undertake work,they may be required to be licensed In accordance with state and,local regulations: If the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br /> under state law, if the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> Intended work,they are advised to contact the Pasco County Building inspection Division--Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the"contractor Block"of this application for which they will be responsible. If you,as the owner sign as the
<br /> contractor,that may be an Indlcallon that he Is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACTIUTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of
<br /> use In existing buildings,or expansion of existing buildings.-as spacified in Pasco County Ordinance number 89-07 and
<br /> 90-U7,as amended. The undersigned also understands,that such fees,as may be due,will be Identified at the time of
<br /> permitting, It Is further understood that Transportation impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a"certificate of occupancy"or final power release. If the project does not Involve a certificate of occupancy or
<br /> final power release,the fees must be paid prior to permit Issuance. Furthermore,if Pasco County Water/Sewer Impact
<br /> fees are due,they must be paid prior to permit Issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work Is$2,500.00 or more,I
<br /> certify that 1, the applicant have been provided with a copy of the "Florida Construction Lien Law--Homeowner's
<br /> Protection Guide°prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the"owner",1 certify that I have obtained a copy of the above described document and promise In good faith to
<br /> deliver it to the"owner"prior to commencement.
<br /> CONTRACTOR'S10WNEITS AFFIDAVIT, I certify that all the Information in this application is accurate and that all work-
<br /> wilt be done in compliance with all applicable laws regulating construction.zoning and land development. Application Is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work wits be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurlsdictlon. I also
<br /> certify that I understand that the regulations of other government agencies may apply to the Intended work,and that It Is
<br /> my responsibility to Identify what actions I must take to be In compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Sayheads,Weiland Areas and Environmentally Sensitive
<br /> Lands,Waterl Wastewater Treatment.
<br /> - Southwest Florida Water Management District-Weirs. Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways,
<br /> - Department of Health & Rehabilitative Ser0cestEnvironmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Environmental Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways,
<br /> I understand that the following restrictions apply to the use of fill:
<br /> - Use of fill Is not allowed in Flood Zone"V"unless expressly permitted.
<br /> - if the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State or Florida. I
<br /> If the rill material is to be used in Flood Zone "Ai In connection with a permitted building using stem wall
<br /> construction,t certify that fill will be used only to fill the area within the stem wail.
<br /> If fill material Is to be used In any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties, if use of fill Is found to adversely affect adjacent properties,the owner may be cited for violating
<br /> the conditions of the building permit Issued under the attached permit application,for lots less than one(1)
<br /> acre which are elevated by fill,an engineered drainage plan is required.
<br /> If 1 am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing,signs,wells, pools,air conditioning,gas, or other installations not specifically included In the application. A
<br /> permit Issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,after,or
<br /> set aside any provisions of the technical codes,not shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans,-construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit Is commenced within six tnonths of permit Issuance,or if work authorized by
<br /> the permit Is suspended or abandoned for a period of six(8)months after the time the work Is commenced. An extension
<br /> may be requested, In writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job Is considered abandoned.
<br /> WARNING;TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT
<br /> WITH YO R LENDER OR AN ATTORNEY BRORE RECORDING YOUR NC��'ICE OF COMMENCEMENT
<br /> r- Oi Rrna�uRAT.(f.s.117 3)
<br /> OWNER OR CENT _.._ CONTRACTOR
<br /> d n to rind)before this d and ss umed)before me this
<br /> a �
<br /> of rson ly known to rb► rhaslhave productrl Ole ally n to or he ve pro uced
<br /> as tdentification. as Identification.
<br /> j ter" Notary Pubiic Notary Public
<br /> commission Nov-- T...tI.Q � Cammiasian No.
<br /> ;141 No'/ 7ld�A'IbtPt+1SG N llama or Notary typed,printod or stamped
<br /> �= MY COMMISSION#FF963675 AMANd
<br /> EXPIRES February 23.2020 ° Y "•,� A ACKERSOtV
<br /> ,•' MY COMMISSION#FF963675
<br /> I GTl'398-Ct53 FkuidallowySurwce.con•
<br /> -WT41 `" EXPIRES February 23.2020
<br /> l4CT1398-0153 fthdallo:a•yservke.com
<br />
|