Laserfiche WebLink
s <br /> STATE LICENSES FL EC130065904.GA_EN213455 <br /> 12) Genset enclosure UL site evaluation and/or testing; <br /> 13) IBC_or seismic compliance and/or calculations; <br /> 14) Equipment performance beyond manufacturer's design; <br /> 15) Third party electrical apparatus testing/inspections; <br /> 16) Specialty testing(emissions,_noise;harmonics, etc.. <br /> 17) Utility Company Fees. This would include_relocation of existing Building Transform_ ers <br /> Fees; <br /> Furthermore,the following information may clarify and assist in better understanding our Scope of Work. <br /> 1. Clean up for debris created by our work force will be collected daily and placed in an on-site <br /> dumpster provided by others. <br /> 2. If selected as contractor for this project,our contract must include by reference this scope of work, <br /> with negotiated modifications,.if any. Further, we reserve the right to review and negotiate the <br /> general conditions of the contract. <br /> 3. All work shall be completed during normal business hours, with the exception of the work <br /> associated with the feeders to the 3rd floor. <br /> 4.. Other than paining it is the intent of this proposal to be a turn-key project. <br /> All of our work_is guaranteed for one year. Due to the fluctuating cost of equipment and available staffing; <br /> this price proposal is only valid for 30 working days from the date of this proposal. <br /> BasePrice Total..................................................................... $2670545:00 <br /> Sincerely; AHS <br /> By:,pn <br /> Daniel A.Thompson <br /> Estimator/Project Manager <br /> CC: Julius Davis;CEO <br /> .Maurice Perez,V/P ,1GiQi <br /> Larry Pasetti, Project Manager Print Name and Title <br /> Jim Ehlers,Director of Electrical Services <br /> Date <br /> VOLTEA91 R <br /> CONSTRUCTORS Page 3 of-3 <br />