My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1377-19 Solar Energy
Zephyrhills
>
Administration
>
City Clerk
>
Vault Files
>
ORDINANCES
>
2019
>
1377-19 Solar Energy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 9:47:56 AM
Creation date
9/30/2019 9:47:54 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
premises and the restoration of the area to a compliant pre-installation condition. <br /> (5) A variance may be applied for lot size,setbacks,height,or solar energy system location requirements <br /> in accordance with Part 12.02.00 of this LDC. <br /> These provisions contained herein this subsection only apply when the solar energy <br /> systems are considered to be accessory. These provisions do not apply to Solar Electric <br /> Power Collection/Generation Facilities as defined in this LDC (refer to Article XIII, <br /> Definitions, and Section 7.09.30). <br /> SECTION 2: That Part 7.09.30 SOLAR ELECTRIC POWER COLLECTION/ GENERATION <br /> FACILITY STANDARDS as outlined below is hereby created and incorporated into the City of <br /> Zephyrhills Land Development Code. <br /> § 7.09.30 SOLAR ELECTRIC POWER COLLECTION/GENERATION <br /> FACILITY STANDARDS. <br /> (A) Purpose - The purpose of this Section is to promote the health, safety, and welfare of <br /> residents by encouraging the safe, efficient, and effective use of clean alternative/renewable <br /> energy sources while ensuring solar electric power collection/generation facilities are compatible <br /> with the surrounding neighborhood. <br /> (B) Authority - This Section implements the policies of the adopted Comprehensive <br /> Plan and Sustainable Community Action Plan. Compliance is a statutory precondition for <br /> the issuance of a Development Order, Development Permit, Right-Of-Way Use Permit, <br /> Building Permit, and Certificate of Occupancy. The provisions of this Section shall be <br /> administered and enforced by the Planning Director or his/her designee. <br /> (C) Applicability-The requirements of this Section shall apply to all Solar Electric Power <br /> Collection/Generation Facilities, within the City, as defined in Article XIII, Definitions, of <br /> this LDC. <br /> (D) Conflicts - If the regulations and requirements of this Section conflict with other <br /> lawfully enacted and adopted rules,regulations, ordinances or laws, the more stringent shall <br /> apply,unless otherwise stated herein. <br /> § 7.09.30.1 SOLAR ELECTRIC POWER COLLECTION/GENERATION <br /> FACILITY STANDARDS WITHIN THE CITY'S SPECIAL AREAS (SAs). <br /> (A) SAs defined - The City's SAs consist of the US Highway 301/Gall Boulevard Corridor <br /> Vision Areas (includes North 301, Form-Based Code District, and South 301), Zephyrhills <br /> Industrial Zone (ZIZ), Community Redevelopment Agency (CRA) Area(s), and Historic <br /> District(s). For the purposes of the application of this LDC, the geographic area of SAs are <br /> further defined as all properties within each SA. Where Master Plans or Design Standards <br /> & Regulations have been adopted for a SA, the standards of that SA shall apply. In cases <br /> of conflict between LDC standards and standards of a SA, the more stringent standard shall <br /> apply. <br /> § 7.09.30.2 SOLAR ELECTRIC POWER COLLECTION/GENERATION <br /> FACILITY STANDARDS CITYWIDE. <br /> (A) The location, construction, and operation of Solar Electric Power <br /> Collection/Generation Facilities shall comply with the following standards: <br /> (1) Siting/location criteria: <br /> (a) Shall be allowed in the C3, LI, and HI zoning districts subject to special exception <br /> approval (level two review); <br /> (b) Shall be located on lots or parcels a minimum of 10 acres; <br /> (c) All solar energy systems and associated equipment shall be setback a minimum of 50 feet <br /> - 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.