Laserfiche WebLink
OR BK 9999 PG 2135 Page 16 of 21 <br /> 56.19.8 REIMBURSEMENT OF DISTRIBUTION SYSTEM;AND TRANSMISSION MAIN <br /> CONSTRUCTION COSTS <br /> Reimbursements for oversizing of reclaimed water transmission mains shall be made in <br /> accordance with City policy regarding oversizing of water and wastewater facilities. <br /> 56.19.9 USE OF RECLAIMED WATER <br /> A. All uses of reclaimed water shall be in accordance with applicable rules of the State <br /> Department of Environmental Protection and other regulatory bodies having jurisdiction. <br /> B. All reuse by the customer shall be voluntary.The Utilities Superintendent may require <br /> effluent take-back agreements with developers where additional wastewater treatment <br /> plant effluent disposal capacity is required as a condition of sewer service. <br /> C. The City will monitor reclaimed water connections so as not to exceed the capacity of the <br /> reclaimed water system or the disposal site.It is the intent of the City to maximize the use <br /> of reclaimed water and to provide service to as many customers as practical.At times it <br /> may be necessary to limit a customer's use of reclaimed water.Notwithstanding any sub- <br /> Ordinance of this Ordinance to the contrary,the City makes no representation as to the <br /> availability or implementation of reclaimed water service within the City.Furthermore, <br /> nothing in this sub-Ordinance shall be construed to create a debt or general obligation of <br /> the City or pledge of the full faith and credit or taxing power of the City. <br /> D. The City reserves the right to temporarily discontinue service to any portion of or to the <br /> entire reclaimed water system as deemed necessary by the Utilities Superintendent. <br /> E. The City reserves the right to establish reclaimed water supply schedules. <br /> F. The City may discontinue reclaimed water service to any customer due to a violation of <br /> this article,nonpayment of bills,for tampering with any service,for plumbing cross <br /> connections with another water source,or for any reason that may be detrimental to the <br /> reclaimed water system.The City has the right to cease service until the condition is <br /> corrected and all costs due the City are paid.These costs may include delinquent billings, <br /> connection charges,and payment for any damage caused to the reclaimed water system. <br /> Should discontinued service be turned on without authorization,the utilities services <br /> branch shall remove the service and make an additional charge as established by the City. <br /> Such discontinuance of service may occur without prior written notice. <br /> G. A customer whose service has been discontinued may resume reclaimed water service by <br /> payment of past due amounts and a reconnection fee;provided,however,when service <br /> has been discontinued for violation of the policies and regulations relating to the use of <br /> the reclaimed water system,service will not be reconnected until the City receives,in its <br /> opinion,reasonable and sufficient guarantee that the violation will not reoccur. <br /> 56.19.10 DESIGN STANDARDS <br /> A. The irrigation system to be provided by the customer under this sub-Ordinance will <br /> consist of an underground system with permanently placed sprinkle devices or <br /> belowground hose bibs contained in a meter box lockable with a five-point bolt.The <br /> locked meter box cover shall be labeled"Reclaimed water"and shall be painted purple. <br /> B. Prior to connection to the City reclaimed water system,a belowground dual check device <br /> shall be installed by the City on the potable water line to each property receiving <br /> reclaimed water service.The dual check device shall be installed on the customer's side <br /> of the potable water curb stop.Maintenance of the dual check device shall be the <br /> responsibility of the customer. <br /> -16- <br />