My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21020
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2020 9:16:19 AM
Creation date
1/7/2020 9:51:45 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
19-21020
Building Department - Name
MARTINEZ,JASMINA & RAIVEN
Address
6679 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Page 2 of 2 <br /> D.Solar Panel Anchorage <br /> 1. Installation shall proceed in accordance with the applicable guidelines and recommendations indicated below. <br /> If, during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office <br /> should be notified before proceeding with the installation. <br /> • EcoFasten Solar Installation Manual, which can be found on the EcoFasten Solar website <br /> (www.ecofastensolar.com). <br /> 2. The solar panels are 11/2'thick and mounted 41/2" off the roof for a total height off the existing roof of 6". At no <br /> time will the panels be mounted higher than 6"above the existing plane of the roof. <br /> 3. The following mounting types shall be used. Please refer to the mounting details for the associated required <br /> penetration depth. Based on our evaluation, the pullout demand is less than the maximum allowable per <br /> connection and therefore is adequate. <br /> • EcoFasten Solar: (1) 5/16" lag screw. Pullout capacity based on National Design Specifications (NDS) <br /> of timber construction specifications for Southern Pine is 235 Ibs/inch penetration. <br /> 4. The maximum allowed spacing was calculated for the Wind Speed shown in paragraph B above, using the wind <br /> load uplift procedures of ASCE 7-10 and is specified below. These spacing requirements apply to all mount <br /> types indicated above. The following values have been verified by in-house testing and the mounting hardware <br /> manufacturers' data, which are available upon request. Panel support connections should be staggered,where <br /> possible,to distribute load to adjacent members. <br /> Modules in Landscape Modules in Portrait <br /> Roof Zone Interior Ede Corner Interior Ede Corner <br /> Max Vertical Spacing in 40 40 40 66 66 66 <br /> Max Horizontal Spacing in 48 48 48 48 48 48 <br /> Max Uplift Load Ibs 369 294 271 623 495 457 <br /> E.Summary <br /> Based on the above evaluation,with the structural repairs completed as prescribed and appropriate panel anchors <br /> being utilized,the roof system designed on will adequately support the additional loading imposed by the solar <br /> panels, if installed correctly.This evaluation has been performed for the structural elements only and verifies that <br /> they are in conformance with the 2017 Florida Building Code- Residential 6th Edition, current industry standards <br /> and practice, and the information supplied to us at the time of this report. <br /> If there are any questions regarding the above, or if more information is required, please contact me. <br /> HE IM <br /> Regards, <br /> J. Matthew Walsh, PE :* N 84 <br /> FL License No. 84923 <br /> STATE OF ; <br /> 0 , <br /> /SS,ONAL <br /> 1/l 11 111 <br /> 03/12/2019 <br /> v'v'nt® ,S <br /> sl1 ,Y� <br />
The URL can be used to link to this page
Your browser does not support the video tag.