My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21036
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 10:00:37 AM
Creation date
1/7/2020 10:00:36 AM
Metadata
Fields
Template:
Building Department
Company Name
ST ELIZABETH'S EPISCOPAL CHURCH
Building Department - Doc Type
Permit
Permit #
19-21036
Building Department - Name
ST ELIZABETH'S EPISCOPAL CHURCH
Address
5855 16TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERICAN <br /> 'V <br /> ISA <br /> Ryman Roofing, Inc. <br /> 501a fee for credit card processing. <br /> A Division ofRymon Construction,Inc. <br /> 36413 SIR 54-Zephyrhills, Florida 33541 Proposal# <br /> Fax(813)788-6773 o. <br /> Phone(813)782-6094 N <br /> 1-855-Go-Ryman (1-855-467-9626) - Lic.#CCC 1325505 Estimate g00740500 <br /> www.RymanRoofing.com <br /> Serving all of Central Florida Job# <br /> Owner/Purchaser.Elizabeth Episcopal Church —Date:. 1/25/19 <br /> Claim#. InsuranceCompany: <br /> Policy# <br /> Job Address: 5855 16th St City: Zephyrhilis Zip: 33542 <br /> Mail to Address: E-Mail Address: <br /> Home#.. 813-393-7548 Cell#: Business M <br /> 0 Complete tear off of existing Asphalt shingles Additional Notes/SpecialConcems: Includes <br /> . One laver included Install new GAF Timberline hd dimensional limited <br /> 0 secure all loose roof decking as needed according lifetime shingles <br /> to Florida Building Codes <br /> Roof dried in with Synthetic Main church and garage included <br /> Rhino roof synthetic underlayment <br /> Install new valley metal with galvanized metal <br /> Z Install new 6 "drip edge color. White -Rhino roof synthetic underlayment <br /> Q Install new lead boots <br /> n7 Install all new general roof vents <br /> Install new ZShingle F❑Metal F-lTile <br /> M Modified Butimen FlTPO Four sheets of plywood included <br /> Manufacturer (shingle, metal or file) GAF <br /> Manufacturer(TPO or Mod.bitumen) <br /> Z Color.(Shingle,Metal orTile) Birchwood Permit and scheduling of inspections <br /> Color(TPOorMOD.Bitumen) <br /> n,( All roof related debris removed from job site,pick-up loose <br /> nails using commercial grade magnet -7 25.00 <br /> n,( All materials,labor and permits furnished Base Price*$ <br /> n/ Provide a 5 year labor warranty <br /> Additional Items: <br /> Payment Method: El Check# ElCash Financing F-1 Insurance Claim <br /> Q Credit Card# Exp.Date CC ID# <br /> Down Payment:$ Amount Financed:$ Approx.Monthly Payment:$ <br /> PaymentTerms: 35%down and balance upon completion <br /> Extras: <br /> *Base Price does NOT include any unforeseen costs as described below unless indicated in"Additional Items"abo-4 . <br /> Deficient 112"plywood replaced at a cost of$ 65.00 per sheet in the roof field,which includes labor&material .All other woodwork/ <br /> i ional labor,such as,but not limited to,valley rebuilding,rafter replacement, Ix decking,etc,will be a rate of$5.00 per lineal foot plus the <br /> cost of materials. <br /> THIS BECOMES A BINDIN.C-WNTRACT UPO{.CCEPTANCE OF PROPOSAL.PURCHASER ACKNOWLEDGES RECEIPT OF A COPY OF THIS CONTRACT. <br /> I ACCEPT THIS PROP AL D HEREBY CEW4tTHA7-lHAVE READ AND FULLY UNDERSTAND THE PROVISIONS.OF THIS CONTRACT. <br /> Purchaser. Date: <br /> Authorized signer 3/12/19 <br /> Estimator Ed <br />
The URL can be used to link to this page
Your browser does not support the video tag.