Laserfiche WebLink
Section <br /> # Final Inspection Complies? Comments/Assumptions <br /> &Re .ID <br /> CK303.3, Furnished 0&M manuals for HVAC ;❑Complies ;,Requirement will be met.' <br /> C•408.2.5. systems within 90 days of system ❑Does Not <br /> 3 acceptance. ;[]Not Observable 1 <br /> ❑Not Applicable <br /> C�4032.4. Minimum one humidity control device ;❑Complies :Requirement will be met. <br /> 2 per installed ;❑Does Not <br /> T156H humidification/dehumidification ❑Not Observable <br /> system.Controls prevent <br /> simultaneous operation of ❑Not Applicable <br /> humidification and dehumidification ; <br /> equipment. <br /> C403.2:4. Minimum one humidity control device ;❑Complies ;Requirement will be met. <br /> per installed ;❑Does Not <br /> [FI56yU humidification/dehumidification i❑Not Observable; <br /> g v system.Controls prevent []Not Applicable <br /> simultaneous operation of PP <br /> a humidification and dehumidification <br /> s-7—X . <br /> equipment. <br /> C403�2 4 : Minimum one humidity control device ;❑Complies ;Requirement will be met. <br /> 2,� : <br /> 4�:.- �., per installed ;❑Does Not ; <br /> I <br /> [FI5'6:] humidification/dehumidification <br /> system.Controls prevent ;❑Not Observable; <br /> w <br /> ;❑Not A <br /> simultaneous operation of Applicable <br /> humidification and dehumidification <br /> equipment. <br /> ;,C403Q.4w71 Minimum one humidity control device ;❑Complies ;Requirement will be met. <br /> C2'41. -; per installed T❑Does Not <br /> jF156] humidification/dehumidification <br /> :LL system.Controls prevent :❑Not Observable: <br /> simultaneous operation of ;❑Not Applicable <br /> humidification and dehumidification <br /> ? sa ._ equipment. ; <br /> G4:0321`° HVAC systems and equipment design ;❑Complies !Requirement will be met. <br /> 1, loads 3,.ti.- loads calculated in accordance with ; <br /> ❑Does Not , <br /> k ANSI/ASHRAE/ACCA Standard 183 or i❑Not Observable; <br /> ACCA Manual N or by an approved <br /> '❑Not Applicable <br /> equivalent computational procedure. PP <br /> Design loads shall be attached to the <br /> ,.,. " <br /> code compliance form submitted to <br /> the building department when the <br /> V,i s building is permitted or, in the event <br /> the mechanical permit is obtained at a <br /> later time,the sizing calculation shall <br /> be submitted with the application for <br /> the mechanical permit. ; <br /> JI-EM7 <br /> HVACsystems and equipment ;❑Complies ;Requirement will be met. <br /> capacity does not exceed calculated ❑Does Not <br /> loads. ;❑Not Observable; <br /> ❑Not Applicable ; <br /> `C40324,. Heating and cooling to each zone is ;❑Complies ;Requirement will be met. <br /> 1. controlled by a thermostat control. ;❑Does Not <br /> [.FI.4r7+]g Minimum one humidity control device <br /> per installed ;❑Not Observable; <br /> humidification/dehumidification ;❑Not Applicable <br /> system. <br /> rC40 2.4. Heating and cooling to each zone is ;❑Complies ;,Requirement will be met. <br /> :1 controlled by a thermostat control. :❑Does Not <br /> pF147j3 Minimum one humidity control device <br /> per installed :.[]Not Observable:, <br /> humidification/dehumidification I[]Not Applicable <br /> system. <br /> 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) Low Impact(Tier 3) <br /> Project Title: Zephyrhills Dental Building Report date: 02/13/19 <br /> Data filename: D:\Hill Foley Rossi\Heartland Dental\Zephyrhills, FL\Heartland Zephyrhills Comcheck.cck Page 10 of 13 <br />