Laserfiche WebLink
NOTICE OF DEED RESTRICTIONS: The undersigned;undersiands°;tha#_this.Psrmit,may.be,subject-to""deed reslrlclions" <br /> which may be more.restttctive-thsi�t County re 01 tioios:--'The undereigned assumes responsibility fort: with-atiy <br /> Applicable deed restrictions, <br /> UNLICENSED-CONTRACTORS AND.CONTRACTOR-RESPONSIBILITIES.-- -If the owner has--hired 'a.contractor or <br /> contractors to undertake work,they maybe roquired:to bwllcensed In accordance.with siate-.and-loca.l_re.gulailons. if°the <br /> contractor Is not Acensed as required�by to*,.both:the owner and contratitor--M6y-be-cited:fortax misdemeanor violation <br /> under state law. If the owner or Intended!contra c;tore are,uncertain as*to what licensing.requirements.may,apply:for-the <br /> Intended work,they are advised to contact the Pasco County Building'Inspection Dii►Islon-L•icensing Section at 727-847- <br /> 8009. iurthermore, If the-owner has hired a contractor of contractors. he Is advised to have the contractor(s)_ sign <br /> portions of the."contractor.®lock",of.this.application.for-which they Will-be.responsible:.;If.you,.as..the owner sign as the" <br /> contractor, that may bean Indication that he•Is not:properly licensed and not"entitled"to permitting privileges In Pasco <br /> County. <br /> TRAWSPORTATION-IEN PACTtUTILITdgS-IMPACY'AND RESOURCE RECOVERY-FEE -The undersigned-understands . <br /> that Transportation impact Fees:and.Recourse Recovery.Fees may',apply to.,the,construction of new buildings,°change of" <br /> use in existing buildings, or::expansion of:.OAi frig"buildings, as speclfled.in Pasco County Ordinance number 89-07 and <br /> 90-07, as amended.-.,The.undersigned also:understands; that:such fees;-.09,i ay_be.due;,wII be.ld6htlfled at the#Imo'df, <br /> permitting. it is further understood that Transportation impact Fees and=Rosource Recovery`Fees,must be paid prior to <br /> receiving a-°certificate ofmccupancy"or final-pow®r.-release. :lf1he project::.does-not-involve,a.certiHcate of occupancy,or ' <br /> final power release;:the fees must be paid#10r to permit issuance. Furthermore;-if.Pasc€r:County.Water/Sewer impact <br /> fees are due,they.musl be-paid prior to.permit-lssusihei-ln accordance witllrappiicabte Fusco County•ordinances. <br /> CONSTRUCTION lLOEM LAB!(Chapter 7131,FIlortda Statutes,as amended): If valuation of work is$2,500.00-or more, I <br /> certify that I, the applicant, have-been provided with. a copy-of,the-"Florida-Construction-"Lion•..Law--Homeowners <br /> Protection Guide*prepared by-the Florida Department of Agriculture and Consumer-Affairs., If the applicant is someone <br /> other than the"owner", I certify that I-havo obtalnatl:a=copy:of.tha above.descdbbd`flocument°and.p.omiswin;goad:faith to <br /> deliver it to the-"owner"'piior to,00mmenedmerit; <br /> CONTRACTOR'S1OWNER'S AFFIDAVIT: 1.cectihr.that all.the,informaition.In-this application Is accurate.and that all work <br /> will be done in compliance with all.applicable laws regulating construction, zoning and•land development. Application is <br /> hereby made to obtain.a-permit.to do.,woik:and Installation as lndicsfed:__.-1-certify that no work'or. Installation-has <br /> commenced prior to Issuance of'a permit"and that.all work will be performed,to most standards of all laws regulating- <br /> construction, County and City codes, zoning regulations, and land development regulations-in the jurisdiction. i-also <br /> certify that I understand that the regulations of other government agencies may•apply.to the intended work, and that it is <br /> my responsibility to Identlfy:what.actlons 1 must-take:to be4n.,compliance: Such agencies include buf are.not limited to: <br /> Department of Environmental.-Protedtion Areas and-Environmentally Sensitive <br /> Lands,Water/QNastewater Treatment. <br /> Southwest Florida Water Management :�Dlsfrict.Welts, Cypress. Bayheads, 'Wetland Areas, Altering <br /> Watercourses. <br /> - Army Corps of Engineers-Seawalls;Docks,Navigable Waterways. <br /> - Department of:Health-: 110abllltetiv6 Serdlces/Environmental Health Unit!!yetis, Wastewater Treatment, <br /> Septic Tanks: <br /> - US Environmental Protection Agency-Asbestos abatement.._ <br /> - Federal Aviation:AuthorityRunways. <br /> 1 understand that the folliwing.restrlstlons-Apply to the use of f ll:- <br /> Use of fill is not allowed in Flbod'Zone IP unless expressly permitted. <br /> If the fill material is to.be used.An_ Flood Zone. "A", it. is understood that a drainage plan addressing a <br /> "compensating volume°.will be submitted at time.of permitting which is prepared by a professional engineer <br /> licensed by the State of Florida: <br /> If the fill"material-is to be used In Flood Zone "A" ins connection-with"_a-permitted building using stem wall <br /> construction, I certify that filimili.beVsed only to fill the-area withinAhe-sternwall. <br /> If fill material is to be used In .any area; 'I=certify that use of such fill will.not adversely affect adjacent <br /> properties. If use of fill Is found to adversoly:affect adjacent properties..the owner may bt}cited for.uiofating <br /> the conditions-'of the building.permit issued under the'"attached..permit application, fotiots less than.one (1) <br /> acre which are elevated-by#III-an engineered drainage plan is required:. <br /> If I am the AGENT FOR THE.OWNER,.I[promise in good faith to inform the owner of the permitting conditions set forth In <br /> this affidavit prior to commencing construction': i understand that-aieeparate permit may be required for electrical work, <br /> plumbing,,signs, welts,.pools,. air.conditioning,_.gas,or.other Insfall&ons not.specifically Included-In.the appllcation. .A <br /> permit issued shall be construed to be-a-license to proceed with the work and not as.authority.to.violate..cancel, alter, or <br /> set aside any provisions of the.technicai codes;-nor shall Issuance,of a-permit.prevent the Bulldifig Official from thereafter <br /> requiring a correction of errors in plans;-construction or violations of any codes.- Every•permit'I.ssued shall-become invalid <br /> unless the work authorized-by such permit-is.commenced within sfit"months of•permlt Issuance, or if work authorized by <br /> the permit Is suspended-oe abandonedfor i:period of41x•(6)-months.aft r-the.time�the�work-4s commenced. An extension <br /> may be requested, in writing,-from the:building.Offlclsl for a porlod.not:to exceed ninely'(90).days and-wili demonstrate <br /> justifiable cause for-the extension; If work ceases,for ninety-(90)consecutivedays,_th\job-is.considered abandoned. <br /> WARNING TO OWNER: YOUR.FAILURE*,TOrREQ9.RD A,NOTICE•.OF�CGMMENCEMENT-MAY-RESULT.-IM'YOUR <br /> PAYING TWICE.FOR_:IMPROVEMEitT3-Tb, OUR-:.Pi PER'TtY- IF-..'yOU,lt4TEW.—.TO'aGTAIN�.FINAfi4EING-,=0SU T <br /> WITHMOURIEN :QI" ATTO N FOR ARii91 G YOU 1`: E CEMENT. <br /> �ORirlA Jt1RAT(f. :t 7 3}. <br /> OWNER OR A6ENT � CONTRACTO <br /> Subscribed and sworn (or affirmed)b are me this Subscribed'and'sworn'to(or-atflrmedyb re mertlift <br /> by by... <br /> Who Islam personalty known tome or.has/have produced. Who.islare pamonally mown•to.me or hoWbaver-produced <br /> as identification. as Identification. <br /> Notary Public Notary Fublk <br /> Commission No: Commisslon_No. <br /> Name of Notary typed,printed or stamped Blame of Notary typed.printed or stamped <br />