Laserfiche WebLink
Itilo12°1 J. <br /> NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to'deed'restrictions° <br /> which may be more restrictive than County regulations. The undersigned assumes responsibiiity for compliance with any ., <br /> applicable dead restrictions. I <br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or <br /> contractors to undertake worts,they may be required to be licensed in accordance with state and local regulations. If the <br /> contractor is not licensed as required by law,both the eumer and contractor may be cited for a misdemeanor violation <br /> under state law. if the owner or Intended contractor are uncertain as to what licensing requirements may apply for the <br /> Intended work,they are advised to contact the Pasco County Building inspsction DivtsiorH icensing Section at 727-847- <br /> 8009. Furthermore, If the owner has hired a contractor or contractors, he to advised to have the contractor(s)sign <br /> portions of the"contractor Block'of this application for which they will be responsible. If you,as the owner sign as the <br /> contractor,that may be an Indication that he Is not property licensed and Is not entitled to permitting privileges to Pasco <br /> County, <br /> TRANSPORTATION IMPACTIUTILRIES IMPACT AND RESOURCE RECOVERY FEES: Tho undamignod undarctonda <br /> that Transportation impact Fees and Recourse Recovery Fees may apply to the corhstrurllon of new buildings,change of <br /> use in existing buildings,or expansion of existing buildings,as specified in Pasco County Ordinance number 8M7 and <br /> 90-07,as amended. The undersigned also understands,that such fees,as may be due,will be Identified at the time of <br /> permitting. It Is further understood that Transportation Impact Fees and Resource.Recovery Fees must be paid prior to <br /> rbeeiving a'certificate of occupancy'or final power►eloese. if the project does not Involve a certificate of occupancy or <br /> final power release,the fees must be paid prior to permit Issuance: Furthermore,11 Pasco County Water/Sower Impact <br /> fees are due,they must be paid prior to permit Issuance In accordance with applicable Pasco County ordinances. <br /> CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,600.00 or more,I <br /> certify that I, the applicant, have been provided with a copy of the 'Florida Construction Lien Law—Homeowner's <br /> Protection Guide prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant Is someone <br /> other than the"owner',I certify that I have obtained a copy of the above described document and promise in good faith to <br /> deliver it to the"owner°prior to commencement. <br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work <br /> will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is <br /> hereby made to obtain a permit to do work and Installation as Indicated. I certify that no worts or Installation has <br /> commenced prior to Issuance of a permit and that all work will be performed to meet standards of all laws regulating <br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also <br /> certify that i understand that the regulations of other government agencies may apply to the Intended wont,and that It Is <br /> my responsibility to Identify what actions 1 must take to be In=npllance. Such agencies include but are not limited to: <br /> - Department of Environmental Protection-Cypress Bayheede, Wetland Aram and Environmentally Sensitive <br /> Lands,Water/Wastewater Treatment. <br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering <br /> Watercourses. <br /> - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. <br /> - Department of Health 6 Rehabilitative SerAces/Envlronmentel Health Unit-Wells, Wastewater Treatment, <br /> Septic Tanks. <br /> - US Environmental Protection Agency-Asbestos abatement. <br /> - Federal Aviation Authority-Runways. <br /> i understand that the folio drig restrictions apply to the use of fill: <br /> Use of fill is not allowed in Flood Zone"W unless expressly permitted. <br /> If the fill material Is to be used In Flood Zone 'A', It is understood that a drainage plan addressing a <br /> 'compensating volume'will be submitted at time of permitting which is prepared by a professional engineer <br /> licensed by the State of Florida. <br /> if the fill material is to be used in Flood Zone"A"in connection with a permitted building using stem wall <br /> construction,I certify that fill will be used only to fill the area within the stem wall. <br /> if fill mala?xial Is to be used In any area, 1 certify that use of such fill will not adversely affect adjacent <br /> properties. If use of fill Is found to adversely affect adjacent propertles,the owner may be cited for violating <br /> the conditions of the building permit issued under the attached permit application,for lots less than one(1) <br /> acre which are elevated by fill,an engineered drainage plan is required. <br /> if I am the AGENT FOR T140 OWNER,i promise in good faith to Inform the owner of the permitting conditians set forth in <br /> this affidavit prior to commencing construction. I understand that a separate permlt may be required for electrical work, <br /> plumbing,signs, wells, pools,air conditioning, gas, or other installations not specifically included in the application. A <br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel.after.or <br /> set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter <br /> requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid <br /> unless the work authorized by such permit is commenced within six months of permit Issuance,or if work authorized by <br /> the permit Is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension <br /> may be requested,in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate <br /> justifiable cause for the extension. 9 work ceases for ninety(90)consecutive days,the job Is considered abandoned. <br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR <br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY, IF YOU INTEND TO OBTAIN FINANCING,CONSULT <br /> Will <br /> Y LENDER 0 ATTORNEYO E O YOURCOM CE <br /> FLORt A URAT(F 1 03) <br /> OWNER OR AGENT CONTRACTOR <br /> & rid f � swm(orfi before mMasgiftnIo <br /> asd <br /> Who� 0 hasftvo prod ced <br /> as Identification, as Identification. <br /> 020W t( ,34� <br /> A�U__Z—Noaary Pubpc Notary PubPo <br /> comrrd on No. 19ACommiefion No. ZuLt Iva <br /> u L 064 <br /> Name of Notary typed,printed or stempsd Name of or slarnoid <br /> , <br /> CASEYLANAEH WAUGH <br /> MY COMMISSION#GG 266126 E <br /> EXPIRES;0cW r 14,2022 <br /> •.OFM1.• 6ondedTfriuNolaryPub6cUnderhxtters <br />