My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21104
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2020 9:22:03 AM
Creation date
1/7/2020 11:00:52 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
19-21104
Building Department - Name
DUNN,JEREMY CLIFFORD
Address
6621 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2of2 <br /> 3. The following mounting-types shall be used. Please refer to the mounting details for the associated required <br /> penetration depth. Based on our evaluation, the pullout demand is less than the maximum allowable per <br /> connection and therefore is adequate. <br /> • EcoFasten Solar: (1) 5/16" lag screw. Pullout capacity based on National Design Specifications (NDS) <br /> of timber construction specifications for Southern Pine is 235 Ibs/inch penetration. <br /> 4. The maximum allowed spacing was calculated for the Wind Speed shown in paragraph B above, using the wind <br /> load uplift procedures of ASCE 7-10 and is specified below. These spacing requirements apply to all mount <br /> types indicated above. The following values have been verified by in-house testing and the mounting hardware <br /> manufacturers'data, which are available upon request. Panel support connections should be staggered, where <br /> possible,to distribute load to adjacent members. <br /> Modules in Landscape Modules in Portrait <br /> Roof Zone Interior Ede Corner Interior Ede Corner <br /> Max Vertical Spacing in 40 40 40 66 66 66 <br /> Max Horizontal Spacing in 48 48 48 48 48 48 <br /> Max Uplift Load Ibs 335 267 247 566 451 417 <br /> D. Summary <br /> Based on the above evaluation, with appropriate panel anchors being utilized the roof system designed on will <br /> adequately support the additional loading imposed by the solar panels, if installed correctly.This evaluation has <br /> been performed for the structural elements only and verifies that they are in conformance with the 2017 Florida <br /> Building Code- Residential 6th Edition, current industry standards and practice, and the information supplied to us <br /> at the time of this report. <br /> If there are any questions regarding the above, or if more information is required, please contact me. <br /> \`0%111111////y <br /> Regards, \ �,, ��cenrsF•.,!_ <br /> �J. Matthew Walsh, PE * <br /> +, <br /> FL License No.84923 aK^a ,►� — <br /> ' � STATE OF WNAL <br /> IN <br /> 111111// <br /> 03/05/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.